If this was my job and time wasn't an issue I'd put a hydrometer on it to make sure the screed was dry, in my opinion a 75mm s&c screed could take up to 3 months to completely dry, if time is a issue I'd use a DPM before tiling with SPF iv used tile masters DPM in the past for this exact problem. Worked a treat ... Geoff
 

Reply to How long to wait until tiling onto 75mm screed in the Canada Tile Advice area at TilersForums.com

There are similar tiling threads here

    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
490
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
651
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
2
Views
593
  • Poll
Hi, I have a small en-suite 1200 x 2400, with a 1200 x 900mm linear drain tray which will have...
Replies
6
Views
914
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
610

Advertisement

New Tiling Questions

Replies you've not seen

Top