Discuss Wet UFH on Block & Beam and Joists... in the Tiling on Underfloor Heating area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)




Chalker

TF
Arms
Reaction score
628
50-55 is minimum for tiling onto. Speak to a screed supplier, they can add fibres to strengthen it. Then it can be reduced by a bit.
@Ajax123 on here is the forum expert on here.
 
S

Swindiff

Gyvlon Thermio+ can go down unbonded onto insulation at a thickness as low as 35mm. I had it installed in my kitchen on top of 50mm celotex. My minimum thickness was 36mm, maximum was 52mm and average was 48mm. More than pleased with it and extremely responsive to the heat in the UFH pipes. I can start to feel it coming through the floor in less than 30 minutes with porcelain tiles laid on top. I had heard all the stores of UFH having to be run pretty much constantly because it takes forever to heat up and cool down, not with this stuff, my UFH gets turned on and of as I would have with the radiators.

Gyvlon Launches New Thermio+ Screed; EasyFlow to Supply Nationwide | EasyFlow - http://www.easyflow.org.uk/news/thermio-screed/
 

Reply to Wet UFH on Block & Beam and Joists... in the Tiling on Underfloor Heating area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,365
Messages
881,187
Members
9,530
Latest member
Apatel
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks