Search the forum,

Discuss External tiling in January! in the Australia Tiling Forum area at TilersForums.com.

Rich Midge

TF
Esteemed
Reaction score
396
Points
598
Location
Liverpool
Evening! Ideas please. My brother owns a sea front hotel in N Wales. He closes for approx 14 days from Jan 2nd in which time we carry out refurb work. This years tasks include tiling the front entrance ramp, I've not measured but it's 30 to 40 mtrs. The problems are obvious, it's an exposed site and its January so temperatures are going to drop below the 5° threshold. Other than maybe warm water mixes, lots of tarpaulins and maybe some kingspan or similar to try and protect it has anyone got any ideas. Unfortunately, moving the job until later in the year isn't an option. Cheers, Rich.
 

widler

TF
Esteemed
Arms
Reaction score
2,341
Points
1,328
Location
England
Why not a scaffold over it with tarpaulins,closed at either end . Only cost a few hundred quid
 
I

Ian

You just need to make sure you keep the frost away from it. It's not an ideal situation but, if it needs doing in Jan, then you'll have to find a way of covering it up overnight.
 

Rich Midge

TF
Esteemed
Reaction score
396
Points
598
Location
Liverpool
Hi mate, covering it is not a problem I'm pretty sure I can keep it dry. Biggest concern is over night temperatures. Any problems that may arise I can't see me getting any backing from the adhesive guys. I'll be using Tilemaster gear so maybe contacting them directly is the way to go. If it was anyone but family I'd walk away saying see you in spring!
 

Rich Midge

TF
Esteemed
Reaction score
396
Points
598
Location
Liverpool
Thanks gents, basically, unless I can find a magic wand we're talking blankets and crossing of fingers. It'll be just my luck I'll make it so snug and watertight we'll have people squatting.
 
J

Just Rizzle

create a polly tunnel over the work and then keep it warm with a hot air gas heater may be an idea?
years ago we did an open area late in te year we covered it in bails of straw excelent insulator ifyou know a friendly farmer?
 

afright

TF
Reaction score
12
Points
1,013
Location
Broadstairs,Kent.
I have done a few floors outside in the winter mainly porches,warm water mixes will not be any good ,and another thing to watch out for is the temp of the substrate you are fixing to,I have used rapid and it has took well over 8 hours to set,and this can not be any good for the integraty of the adhesive.
 
D

Dougs Third Go

I have done a few floors outside in the winter mainly porches,warm water mixes will not be any good ,and another thing to watch out for is the temp of the substrate you are fixing to,I have used rapid and it has took well over 8 hours to set,and this can not be any good for the integraty of the adhesive.
my thoughts exactly. Not a job I'd take on, family or not, at this time of year.
 

Reply to External tiling in January! in the Australia Tiling Forum area at TilersForums.com

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
667
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
644
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.