yrag1964
Hi,
I have 70sqm of floors tiles to lay in one house, ( I also have a further 50sqm floors and walls upstairs aswell!!)which are going to be laid onto gypsum based floor screeds, I was wanting to know if anyone had done any before and what materials were used e.g adhesive and primer and how long was it after the screed had been laid was the tiles put down? (because the owner of the house says that it can be painted with something so that it can be tiled onto before fully drying his builder told him this) what could it be possibly painted with to tile while still drying?
I have 70sqm of floors tiles to lay in one house, ( I also have a further 50sqm floors and walls upstairs aswell!!)which are going to be laid onto gypsum based floor screeds, I was wanting to know if anyone had done any before and what materials were used e.g adhesive and primer and how long was it after the screed had been laid was the tiles put down? (because the owner of the house says that it can be painted with something so that it can be tiled onto before fully drying his builder told him this) what could it be possibly painted with to tile while still drying?