Ian

I am doing one as we speak. I am 100% confident on how to deal with them having done approx, 250 m2 now. Follow the correct procedures and you will be fine; remove laitence, then moisture test after this has been done, commission UFH, then moisture test again, use a suitable gypsum based adhesive to either stick tiles or any membranes and always tank any areas that are likely to get wet.
 

Andy Tiler

TF
Arms
Reaction score
45
Points
1,043
Location
manchester
I am doing one as we speak. I am 100% confident on how to deal with them having done approx, 250 m2 now. Follow the correct procedures and you will be fine; remove laitence, then moisture test after this has been done, commission UFH, then moisture test again, use a suitable gypsum based adhesive to either stick tiles or any membranes and always tank any areas that are likely to get wet.

Are gypsum screeds/adhesive used in wet area bri?...
 
D

Dave H

Hi Dave, dont like tiling on them as allways an element of doubt, but have now laid in the region of 600m2 on to it, though
most has been hemihydrate screed (mayhew easyscreed), same beast/ different name! havent tried gypsum adhesives yet, but always use black pad on polisher to sand floor, hoover, check moisture content is at low enough reading and prime with Bal APD two coats, first diluted 1-1 neat 2nd coat, then lay ditra and tile. worked so far, but still worry about it!
 
D

DHTiling

I think we all have doubts now and again dave..

I like your method of using the black pads.. how long them they last mtrge wise.?
 
I

Ian

Are gypsum screeds/adhesive used in wet area bri?...

In the first house I did all the bathrooms were wet rooms and all of them had calcium floors, all waterproofed with dural ci++ and corners/joints taped, lapped 100mm up the walls as well.
 
D

DHTiling

In the first house I did all the bathrooms were wet rooms and all of them had calcium floors, all waterproofed with dural ci++ and corners/joints taped, lapped 100mm up the walls as well.

I have had a few wet floors now with Gyvlon and the latest was Gypsol .. as you , i fully waterproof them out to prevent any water getting to the screed.. these screeds are poured long before we get to know the use of the room ..
 

Ajax123

TF
Esteemed
Arms
Reaction score
931
Points
1,213
Location
Lincolnshire
Some stuff in here that mit be helpfull. havent got round to addin tile master to the list of suppliers yet

Broken Link Removed
 
Last edited by a moderator:
D

Dave H

I think we all have doubts now and again dave..

I like your method of using the black pads.. how long them they last mtrge wise.?


Normally last for about 200m2 depends how much laitance on floor less on hemihydate screeds
 
S

Stef

Having a moisture test done this week on a Gyvlon screed.
They (builder) are a bit apprehensive about it but I've told them to follow correct procedure & it will be fine.
Still trying to talk them into getting an order from Lee @ tile town for tile master adhesive.
 

Reply to Anhydrite Screeds: Are You Confident When Tiling To Them? in the Canada Tile Advice area at TilersForums.com

There are similar tiling threads here

I've got an AKW Tuff form shower tray with a waste that is 10mm above the tray when fully...
Replies
6
Views
1K
Hi all, I've laid some Arditex NA over the kitchen floor area (not under cabinets. The area is...
Replies
3
Views
1K
Hi, I'm new to the forum and fairly new to tiling, my only previous "proper" job was my recent...
Replies
3
Views
2K
    • Like
  • Sticky
Water Damaged Shower Repairs Shower tile repair – water damage – tile waterproofing Do you...
Replies
0
Views
2K
Hello there, Relatively recently we had a new en-suite fitted (complete rip out of the old...
Replies
5
Views
2K
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top