F
fergy7197
Been asked to tile some outside steps...
the jobs are rollin in!!:lol:
Any advice on this?
adhesive, grouts etc.
think quarry tiles are going to be used.
The important things I can see are it being flat for a start, maybe dry laying all the cuts on each step then fixing?
the jobs are rollin in!!:lol:
Any advice on this?
adhesive, grouts etc.
think quarry tiles are going to be used.
The important things I can see are it being flat for a start, maybe dry laying all the cuts on each step then fixing?