Search the forum,

Discuss Tiling onto cement render in the Canada Tile Advice area at TilersForums.com.

D

dickiem

Hi, newbie (DIYer) hoping for some help.

I'm tiling my bathroom onto new cement render, how long do I need to leave the render before putting the tiles on?

Thanks
 
W

White Room

Hi and welcome.....they do say 4 weeks, how long has it been since it was rendered.
 
T

The Legend; Phil Hobson RIP

How thick is the render? rule of thumb same as screed 1mm per day.
 
T

The Legend; Phil Hobson RIP

Sorry Mark posted at the same time, four weeks is what we used to work on.:thumbsup:
 

Ajax123

TF
Esteemed
Arms
Reaction score
931
Points
1,213
Location
Lincolnshire
Agreed four weeks.... Or 28 days. This is because all strength testing on cement based materials is based on 28day tests.
 
D

dickiem

Hi and welcome.....they do say 4 weeks, how long has it been since it was rendered.

Hi, thanks for the replies.

It will all be 'rendered' this week. It's not actually a full render, it's various thicknesses (up to probably 5mm max) in patches merely to flatten the blockwork and to give a level surface for tiling onto. I've used a 4 to 1 to 1, sand:cement:lime mix.

It'll be a bummer if I have to wait 4 weeks, the bathroom is a right mess as you'd expect:oops:
 
Last edited by a moderator:

nybor62

TF
Reaction score
65
Points
1,083
Location
rotherham
why not dot and dab some new board on to the wall , putting render on as thin as that imo , will not be sound enough
other,s may have a different view on it
 
D

dickiem

why not dot and dab some new board on to the wall

Hi,

My room is very narrow and I've had to go back to block to maximise the width I have in order to accommodate a vanity unit and the bath with a bit of clearance. With plaster or dot n dab I would end up with insufficient width to get everything in:-/
 
W

White Room

You should be putting 12mm render for one coat so it gives you a chance to flatten out, 5mm may lose some strength with that thickness and find difficult to level out.
 
D

dickiem

You should be putting 12mm render for one coat so it gives you a chance to flatten out, 5mm may lose some strength with that thickness and find difficult to level out.

I only have 'patches' where the aggregate block faces aren't flush but some are the size of a couple of blocks. 12mm reduction either side of the room would leave me insufficient overall width to fit the bath and vanity. Guess I'm stuck with what I've got so have to hope it's sound enough:-/ I wish I hadn't started now:-(
 
A

Aston

28 days drying time as the above have members have stated

and i am with whitebeam with a coat of around 11-12mm
 

Reply to Tiling onto cement render in the Canada Tile Advice area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

There are similar tiling threads here

    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
398
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
585
10 Tiling Tips for Fixing Tiles to Bathroom Walls = From UKTilingForum.co.uk There are a few...
Replies
1
Views
651
The trustpilot reviews for tilers-world are excellent, but there's not a huge number of them...
Replies
3
Views
899
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
2
Views
516

Advertisement

New Tiling Questions

Replies you've not seen

Top
Tiling onto cement render > Tiling Advice - Tilers Forums
Search the forum,

Discuss Tiling onto cement render in the Canada Tile Advice area at TilersForums.com.

D

dickiem

Hi, newbie (DIYer) hoping for some help.

I'm tiling my bathroom onto new cement render, how long do I need to leave the render before putting the tiles on?

Thanks
 
W

White Room

Hi and welcome.....they do say 4 weeks, how long has it been since it was rendered.
 
T

The Legend; Phil Hobson RIP

How thick is the render? rule of thumb same as screed 1mm per day.
 
T

The Legend; Phil Hobson RIP

Sorry Mark posted at the same time, four weeks is what we used to work on.:thumbsup:
 

Ajax123

TF
Esteemed
Arms
Reaction score
931
Points
1,213
Location
Lincolnshire
Agreed four weeks.... Or 28 days. This is because all strength testing on cement based materials is based on 28day tests.
 
D

dickiem

Hi and welcome.....they do say 4 weeks, how long has it been since it was rendered.

Hi, thanks for the replies.

It will all be 'rendered' this week. It's not actually a full render, it's various thicknesses (up to probably 5mm max) in patches merely to flatten the blockwork and to give a level surface for tiling onto. I've used a 4 to 1 to 1, sand:cement:lime mix.

It'll be a bummer if I have to wait 4 weeks, the bathroom is a right mess as you'd expect:oops:
 
Last edited by a moderator:

nybor62

TF
Reaction score
65
Points
1,083
Location
rotherham
why not dot and dab some new board on to the wall , putting render on as thin as that imo , will not be sound enough
other,s may have a different view on it
 
D

dickiem

why not dot and dab some new board on to the wall

Hi,

My room is very narrow and I've had to go back to block to maximise the width I have in order to accommodate a vanity unit and the bath with a bit of clearance. With plaster or dot n dab I would end up with insufficient width to get everything in:-/
 
W

White Room

You should be putting 12mm render for one coat so it gives you a chance to flatten out, 5mm may lose some strength with that thickness and find difficult to level out.
 
D

dickiem

You should be putting 12mm render for one coat so it gives you a chance to flatten out, 5mm may lose some strength with that thickness and find difficult to level out.

I only have 'patches' where the aggregate block faces aren't flush but some are the size of a couple of blocks. 12mm reduction either side of the room would leave me insufficient overall width to fit the bath and vanity. Guess I'm stuck with what I've got so have to hope it's sound enough:-/ I wish I hadn't started now:-(
 
A

Aston

28 days drying time as the above have members have stated

and i am with whitebeam with a coat of around 11-12mm
 

Reply to Tiling onto cement render in the Canada Tile Advice area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

There are similar tiling threads here

    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
398
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
585
10 Tiling Tips for Fixing Tiles to Bathroom Walls = From UKTilingForum.co.uk There are a few...
Replies
1
Views
651
The trustpilot reviews for tilers-world are excellent, but there's not a huge number of them...
Replies
3
Views
899
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
2
Views
516

Advertisement

New Tiling Questions

Replies you've not seen

Top