D
davemul
Hey guys
I'm completely gutting our bathroom (walls/ceiling and floor)
I'm putting up 12.5mm marmox board on all the walls and fitting a 900x900 showerstone tray in the corner direct to joists, surrounded by 18mm ply and 4mm marmox board.
My question for today is...
A) Do I fit the wall boards first to the studs, all the way down to the joists..THEN butt the showerstone tray up to these boards.. and tank the joins with waterproof tape?
or
B) Do I fit the tray in to the corner then fit the wall boards so the come down on to the tray, and then tape the joins?
thanks guys
I'm completely gutting our bathroom (walls/ceiling and floor)
I'm putting up 12.5mm marmox board on all the walls and fitting a 900x900 showerstone tray in the corner direct to joists, surrounded by 18mm ply and 4mm marmox board.
My question for today is...
A) Do I fit the wall boards first to the studs, all the way down to the joists..THEN butt the showerstone tray up to these boards.. and tank the joins with waterproof tape?
or
B) Do I fit the tray in to the corner then fit the wall boards so the come down on to the tray, and then tape the joins?
thanks guys