- Reaction score
- 513
Been working on a wetroom last couple of weeks. i put down a white penny mosaic floor on Friday. by the afternoon plumber was in to fit a towel warmer and has made a right hash of it!
first of all pipes were but too long. then too short. pipes exit through the wall. both pipes have cracked tiles around them where he's pulled the copper through to give a bit more. but. because he hasn't cleaned his soldered joint up excess solder on the elbow has broke the tiles.
Lastly. he opted to pull the stop ends off and get the valves off when live! The water and inhibitor in it has destroyed four sheets of mosaic. I've just finished putting everything right so i can crack on with my final cuts!!!
first of all pipes were but too long. then too short. pipes exit through the wall. both pipes have cracked tiles around them where he's pulled the copper through to give a bit more. but. because he hasn't cleaned his soldered joint up excess solder on the elbow has broke the tiles.
Lastly. he opted to pull the stop ends off and get the valves off when live! The water and inhibitor in it has destroyed four sheets of mosaic. I've just finished putting everything right so i can crack on with my final cuts!!!