Dave Dux

Work needed ASAP. Existing tiler never turned up for the job after bathroom removal. 2 year old and 7 month pregnant wife in house, stress!

floor - insulation board and durabase matting to be installed before tiling. Insulation board can be installed with tile adhesive alone, according to uheat. Patterned tiles to be laid in random pattern. Floor already prepared with 18mm chipboard (noggins installed) and 6mm NMP, installed with nmp megastrength ad and screws.

Walls - tile around bath and wall that includes window and boxing with worktop to conceal cistern. Remaining wall to be tiled to half height. Grout lines to be aligned on all tiles walls.

Option to include dry lining and skimming of one wall. 2m wise by 2m tall.
 

Reply to Bathroom tiling job Derby- before christmas in the Tiling Jobs | Find a Tiler - Post Tiling Work Here area at TilersForums.com

There are similar tiling threads here

Hello there, Relatively recently we had a new en-suite fitted (complete rip out of the old...