Hi,

Currently getting a new bathroom fitted with metro tiles. The tiler is back today to finish off grouting and laying the floor tiles. I've gone in this morning to check the last 2 days work (having been busy working myself so couldn't check before now) and I am pretty unhappy with the way the tiles have been laid very unevenly in my opinion. Is this acceptable or unavoidable for some reason? Thanks.
 
Reaction score
0
Points
36
Location
Maidstone, Kent
20210711_063012.jpg
 
Reaction score
0
Points
36
Location
Maidstone, Kent
Just spoke to the guy and this is what he said. Unfortunately didn't let me know otherwise I would have got it replastered. It is an old, terraced, edwardian house so doesn't help either!
 

GAZ5518

TF
Esteemed
Arms
Reaction score
142
Points
558
Location
EPSOM
The center joints look to be in line so definitely walls are out as is
frame which you couldn’t really do anything about…. Grout in white will help blend in.
 
Reaction score
1
Points
38
Location
Newmarket UK
Two things you need to do:

1 . Hold a (decent length) level (vertically) against the vertical edge of one tile to show how aligned the vertical edges of the tiles are.

2. Hold a (decent length) level vertically against the corners of your walls and photograph the bubble to show how plumb your walls are.

It's hard to tell from the photos you posted, but it does look to me like the tiles are not vertically aligned (I held a straight edge rule on one tile edge and the tiles are out of plumb on all your photos so it's suspicious).... However, it could be a combination of both as tiles are way out looking at your photos.


If your walls really are that far out, that should have been mentioned to you (if the tradesman was any good) before the job was started so you were aware of the problem --- it could have been easily rectified by overboarding. Another potential issue is that if your walls are that far out, a lot of not-very-good tilers will start tiling from one corner of the room relying on the corner edge as their plumb line. Problem is, if that's out (and it usually is) the tiles will never be properly vertically aligned - that might have been done in your case as you've not photographed all corners.
 
Last edited:

Kevbos

Arms
Reaction score
35
Points
443
Location
London, UK
Two things you need to do:

1 . Hold a (decent length) level (vertically) against the vertical edge of one tile to show how aligned the vertical edges of the tiles are.

2. Hold a (decent length) level vertically against the corners of your walls and photograph the bubble to show how plumb your walls are.

It's hard to tell from the photos you posted, but it does look to me like the tiles are not vertically aligned (I held a straight edge rule on one tile edge and the tiles are out of plumb on all your photos so it's suspicious).... However, it could be a combination of both as tiles are way out looking at your photos.


If your walls really are that far out, that should have been mentioned to you (if the tradesman was any good) before the job was started so you were aware of the problem --- it could have been easily rectified by overboarding. Another potential issue is that if your walls are that far out, a lot of not-very-good tilers will start tiling from one corner of the room relying on the corner edge as their plumb line. Problem is, if that's out (and it usually is) the tiles will never be properly vertically aligned - that might have been done in your case as you've not photographed all corners.
To me it looks like !what happens all too often , a plumber has also been involved in the new bathroom , as capped pipes in picture , it's very easy for criticism, but we don't know budgets etc etc !! Is a builder involved , it's not right that walls are wrong , but who was responsible for preparation??
 
Reaction score
1
Points
38
Location
Newmarket UK
To me it looks like !what happens all too often , a plumber has also been involved in the new bathroom , as capped pipes in picture , it's very easy for criticism, but we don't know budgets etc etc !! Is a builder involved , it's not right that walls are wrong , but who was responsible for preparation??
Doesn't detract from the fact that whoever tiled it didn't do a good job. If the plumber left capped pipes to tile around then that's fine and in ideal world, just what you want..... The tiler should have checked the room for plumb before doing anything, in this case as the walls are waaaay off plumb he should have let the client know before just going ahead and starting the job...... I mean, that's what is meant by professionalism.
 

Kevbos

Arms
Reaction score
35
Points
443
Location
London, UK
Doesn't detract from the fact that whoever tiled it didn't do a good job. If the plumber left capped pipes to tile around then that's fine and in ideal world, just what you want..... The tiler should have checked the room for plumb before doing anything, in this case as the walls are waaaay off plumb he should have let the client know before just going ahead and starting the job...... I mean, that's what is meant by professionalism.
A professional plumber would have also brought this up as usually its there job as s whole
 

Kevbos

Arms
Reaction score
35
Points
443
Location
London, UK
A professional plumber would have also brought this up as usually its there job as s whole
And what I mean is , do we know if there is a builder , or plumber etc who's job it is ? Do we know the circumstances of the tiler doing the job , because if it is someone else's job , the tiler may have been told to just tile it , ideal world situations are great if they work , but if you book in 2 or 3 days to do a job !turn up , walls are not great ,then told to do best you can ! Which does happen , a situation arises , you go home have 3 days off , or raise problem with the builder or plumber etc , if they are not willing to rectify walls , what do you do ?? Go to customer who essentially not your customer and raise issue !! Lose all future work with builder plumber or do as you are told ?? Unfortunately there are to many poor trades out there
 

Kevbos

Arms
Reaction score
35
Points
443
Location
London, UK
A professional plumber would have also brought this up as usually its there job as s whole
Essentially it's a bad job !! But we don't know all circumstances , and I was just lucky to mostly work alongside great plumbers and builders , who also knew I would not tile over poor preparation!!
 

Reply to Bad job or unavoidable? in the America Tile Forum area at TilersForums.com

There are similar tiling threads here

    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
407
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
543
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
751
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
593

Advertisement

New Tiling Questions

Replies you've not seen

Top