Our new extension is currently being built. Our old square kitchen is doubling in size. As you walk into the old kitchen you walk on floorboards, but about 1meter in this changes to concrete/quarry tiles. The new extension is being ply’d out with 18mm ply. The original plan was to dig out the concrete so that the substrate is all 18mm ply. However the builders now tell me that they are going to ply the new part of the kitchen and just leave the old part as is. This means tiling onto floorboards, then concrete, then 18mm ply. I went through the roof because we agreed to ply the whole lot. I am now being informed that the builder thought that there was only going to be a little bit of concrete to dig out. It turns out that there is a lot of concrete to dig out and it’s very tough. I told the builder that there is no way I can tile and lay UFH across 3 substrates. I am correct, aren’t I?