Tile Forum | America Tile Forum

Welcome to America Tile Forum, the USA Tile Industry. The Tile Association of America.

Discuss Shower and bathroom installation questions in the Tanking and Wetrooms Forum area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)




Reaction score
0
Hi -- I'd be very grateful for any advice anyone could give me.

I'm a general contractor rather than a specialist tiler. I've installed bathrooms before in the course of general home renovation, so I've been able to get the floors up, fix and reinforce joists where necessary, and install appropriate subflooring before tiling and putting in shower trays. Now I've been brought in to do some work on an extension, and the owners have already done the floor and stud walls for the proposed bathroom, which is in the corner of a larger room. The way they've done it has left me scratching my head a bit ...

The floor is a fairly thin OSB, with the sheets not staggered. Consequently there's a fair amount of deflection. Additionally, the studs have been installed so that the bottom plate fits snug against three sides of the shower tray (which they'd already 'installed' by sitting it on the OSB and siliconing round the top!). I'm at a loss as to what to do here -- in the past I've always boarded down to the floor and then put the shower tray up against boards and upstand seal, then tiled up from the tray, whereas here it seems like I'm expected to have the sides of the shower tray flush with exposed studs and have the bottom of the boards boards on the surface of the shower tray. It's that, take the studs out and move the bottom plates back, or get a smaller shower tray.

Could anyone give me any guidance about how to proceed? I can install a decent bathroom left to my own devices, but I'm not sure enough of myself to do it on top of someone else's half arsed job.

Would it be adequate to glue and screw some more appropriate flooring on top of the current OSB and bed the shower tray on tile adhesive / sand & cement on top of that? Is there a way of doing the walls that will keep a water tight seal against the top of the shower tray, or will it mean moving studs / changing shower tray?

Thanks in advance for all your help, you've got a really useful forum here.
 

Reply to Shower and bathroom installation questions in the Tanking and Wetrooms Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

Please note that this thread is old so replying to it may not get a response. You'd be best posting a new thread with a good 4 or 5 word title.
This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,367
Messages
881,195
Members
9,530
Latest member
Apatel
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks