Tile Forum | America Tile Forum

Welcome to America Tile Forum, the USA Tile Industry. The Tile Association of America.

back

The human back, also called the dorsum, is the large posterior area of the human body, rising from the top of the buttocks to the back of the neck. It is the surface of the body opposite from the chest and the abdomen. The vertebral column runs the length of the back and creates a central area of recession. The breadth of the back is created by the shoulders at the top and the pelvis at the bottom.
Back pain is a common medical condition, generally benign in origin.

View More On Wikipedia.org
  1. D

    Clocks go back tonight.

    well around 2 am Sunday..:) Check this out as well..>> http://www.tilersforums.com/general-chat/53565-pm-hints-changing-clocks-if-scots.html
  2. L

    Proper Job - Sink Back splash - How?

    Hello all, Please see the attached pictures. I am a Diy'er. The Wall - multi finish - painted. The worktop - laminated chipboard. I want to create a black-splash (including the side of the sink) to protect the rear/side of the chipboard worktop from water that could potentially get through...
  3. T

    Had to go back to a job!

    Well it was done 27 years ago and the Lady wanted a NEW BATHROOM! And I'am posting my picture of a bathroom that wasn't tiled by me - it was done by an apprentice I had 27 years ago. But Little John and I were back there today to start the strip out. She's hoping the New Shower room will last...
  4. K

    replacing a tile.. wall is back to breeze block ?

    Hi All, Some advise please.... I had to remove a tile that got chipped whilst tiling my shower.... problem is I got the tile off with some effort but virtually all the ptaster came off with it exposing the breeze block. can I replace the tile straight onto the breeze block, I am using...
  5. D

    Steps are coming back

    http://www.youtube.com/watch?v=E9L-0x92vXk
  6. G

    Came Crawling Back

    Was doing about 10 to 20 days a month for bathroom company for over 2 years & during this time my rates never increased, I arrived at 8am every morning, every job was completd to a high standard & completed ahead of schedule even if it meant working to late oclock, I was also never called back...
  7. N

    need help regarding starting a small tiling business when im back from the rigs...

    Hi guys... I work offshore so I am away for 6 months of the year, the other 6 I have at home. I was thinking about tiling as a second job. I live in the Tayside region. I tiled a bit when i left school for maybe 6 months then I stopped. I have tiled my own kitchen, bathroom etc and although I...
  8. D

    only went for a holiday...came back with this!

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Please visit our sponsor websites, they keep the forum free to use!
Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,367
Messages
881,195
Members
9,530
Latest member
Apatel
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks