Search the forum,

Discuss What sub base for tiles in the DIY Tiling Forum area at TilersForums.com.

J

J Sid

British Standard states
6.3.4.2 New timber bases New timber bases should be constructed with noggings between the joists. Water and boil proof (WBP) exterior grade plywood of 15 mm minimum thickness should be screwed to both joists and noggings at 300 mm maximum intervals. The lower face and edges of plywood should be sealed against the ingress of moisture using preferably non-aqueous sealers, e.g. polyurethane varnish, or styrene butadiene rubber, to prevent distortion by changes in atmospheric humidity before being screwed down. All junctions between boards should be supported by noggings or joists.
 

Reply to What sub base for tiles in the DIY Tiling Forum area at TilersForums.com

There are similar tiling threads here

    • Like
  • Question
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for tiling.I have removed the floor boards and plan to lay 18mm WBP plywood.The question is, what...
Replies
1
Views
618
  • Question
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in preparation for tiling. A couple of days after there's a lot of very fine cracks which have appeared, you...
Replies
5
Views
788
Hello there, Relatively recently we had a new en-suite fitted (complete rip out of the old fittings, and old wall tiles and floor carpet). This consisted of a quadrant shower enclosure, a...
Replies
5
Views
2K
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.

Advertisement

Top