Search the forum,

Discuss Waterproofing Shower Advice in the Tanking and Wetrooms area at TilersForums.com.

woodsy5

TF
Reaction score
1
Points
38
Location
suffolk
Hello, hoping for some advise

I have removed plasterboard around my shower enclose to add hardiebacker or aquapanel boards. Only problem is on one wall I will be joining one of these boards to existing plasterboard that has been plastered and I will have a 3mm lip between boards.

What’s the best way of levelling out these boards prior to tiling?

Thanks
 

Boggs

TF
Esteemed
Arms
Reaction score
4,729
Points
1,118
Location
Uk
Pack between the stud and backer board with a strip of 3mm hardboard or ply.

Don’t forget to tape this joint if it’s in the wet area and tank the backer boards. :)
 

Reply to Waterproofing Shower Advice in the Tanking and Wetrooms area at TilersForums.com

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
640

Advertisement

New Tiling Questions

Replies you've not seen

Top