Morning all,
Recently tiled a bathroom but I have a problem with the floor tiles in the shower area that appear to have lifted. Bathroom has probably been tiled for a year but only used for the last two months.
Floor makeup as follows

Pozijoists over specced with 1/3 of the usual deflection and then centres set at 400mm rather than the specified 600mm ( I have a strong dislike of bouncy floors)

25mm egger chipboard flooring glued and screwed at perimeter as per egger instructions.

In the main area xps board fixed to the primed chipboard with bal flexible tile adhesive.

In the shower area xps shower former fixed as above

Shower area tanked with taped joints

Electric ufh mat fitted in both areas and self levelling applied to cover ufh

Self levelling primed and tiles stuck down with bal micromax flexible grout

At the time I believed all the above was correct but I now have two hairline cracks in the grout in the shower area and one or maybe two tiles that are showing signs of movement.

Anyone any ideas what I’ve got wrong?

Thanks in advance
 
Reaction score
0
Points
36
Location
Lincs
Morning all,
Recently tiled a bathroom but I have a problem with the floor tiles in the shower area that appear to have lifted. Bathroom has probably been tiled for a year but only used for the last two months.
Floor makeup as follows

Pozijoists over specced with 1/3 of the usual deflection and then centres set at 400mm rather than the specified 600mm ( I have a strong dislike of bouncy floors)

25mm egger chipboard flooring glued and screwed at perimeter as per egger instructions.

In the main area xps board fixed to the primed chipboard with bal flexible tile adhesive.

In the shower area xps shower former fixed as above

Shower area tanked with taped joints

Electric ufh mat fitted in both areas and self levelling applied to cover ufh

Self levelling primed and tiles stuck down with bal micromax flexible grout

At the time I believed all the above was correct but I now have two hairline cracks in the grout in the shower area and one or maybe two tiles that are showing signs of movement.

Anyone any ideas what I’ve got wrong?

Thanks in advance
 
Reaction score
0
Points
36
Location
Lincs
Morning all,
Recently tiled a bathroom but I have a problem with the floor tiles in the shower area that appear to have lifted. Bathroom has probably been tiled for a year but only used for the last two months.
Floor makeup as follows

Pozijoists over specced with 1/3 of the usual deflection and then centres set at 400mm rather than the specified 600mm ( I have a strong dislike of bouncy floors)

25mm egger chipboard flooring glued and screwed at perimeter as per egger instructions.

In the main area xps board fixed to the primed chipboard with bal flexible tile adhesive.

In the shower area xps shower former fixed as above

Shower area tanked with taped joints

Electric ufh mat fitted in both areas and self levelling applied to cover ufh

Self levelling primed and tiles stuck down with bal micromax flexible grout

At the time I believed all the above was correct but I now have two hairline cracks in the grout in the shower area and one or maybe two tiles that are showing signs of movement.

Anyone any ideas what I’ve got wrong?

Thanks in advance
Slight error above!! I didn’t stick the tiles down with grout! Stuck with back flexible adhesive and then grouted with bal micromax
 

Reply to Shower area tiles lifting in the Tanking and Wetrooms Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
585
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
398
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
535

Advertisement

New Tiling Questions

Replies you've not seen

Top
Shower area tiles lifting > Tiling Advice - Tilers Forums
Search the forum,

Discuss Shower area tiles lifting in the Tanking and Wetrooms Forum area at TilersForums.com.

Reaction score
0
Points
36
Location
Lincs
Morning all,
Recently tiled a bathroom but I have a problem with the floor tiles in the shower area that appear to have lifted. Bathroom has probably been tiled for a year but only used for the last two months.
Floor makeup as follows

Pozijoists over specced with 1/3 of the usual deflection and then centres set at 400mm rather than the specified 600mm ( I have a strong dislike of bouncy floors)

25mm egger chipboard flooring glued and screwed at perimeter as per egger instructions.

In the main area xps board fixed to the primed chipboard with bal flexible tile adhesive.

In the shower area xps shower former fixed as above

Shower area tanked with taped joints

Electric ufh mat fitted in both areas and self levelling applied to cover ufh

Self levelling primed and tiles stuck down with bal micromax flexible grout

At the time I believed all the above was correct but I now have two hairline cracks in the grout in the shower area and one or maybe two tiles that are showing signs of movement.

Anyone any ideas what I’ve got wrong?

Thanks in advance
 
Reaction score
0
Points
36
Location
Lincs
Morning all,
Recently tiled a bathroom but I have a problem with the floor tiles in the shower area that appear to have lifted. Bathroom has probably been tiled for a year but only used for the last two months.
Floor makeup as follows

Pozijoists over specced with 1/3 of the usual deflection and then centres set at 400mm rather than the specified 600mm ( I have a strong dislike of bouncy floors)

25mm egger chipboard flooring glued and screwed at perimeter as per egger instructions.

In the main area xps board fixed to the primed chipboard with bal flexible tile adhesive.

In the shower area xps shower former fixed as above

Shower area tanked with taped joints

Electric ufh mat fitted in both areas and self levelling applied to cover ufh

Self levelling primed and tiles stuck down with bal micromax flexible grout

At the time I believed all the above was correct but I now have two hairline cracks in the grout in the shower area and one or maybe two tiles that are showing signs of movement.

Anyone any ideas what I’ve got wrong?

Thanks in advance
 
Reaction score
0
Points
36
Location
Lincs
Morning all,
Recently tiled a bathroom but I have a problem with the floor tiles in the shower area that appear to have lifted. Bathroom has probably been tiled for a year but only used for the last two months.
Floor makeup as follows

Pozijoists over specced with 1/3 of the usual deflection and then centres set at 400mm rather than the specified 600mm ( I have a strong dislike of bouncy floors)

25mm egger chipboard flooring glued and screwed at perimeter as per egger instructions.

In the main area xps board fixed to the primed chipboard with bal flexible tile adhesive.

In the shower area xps shower former fixed as above

Shower area tanked with taped joints

Electric ufh mat fitted in both areas and self levelling applied to cover ufh

Self levelling primed and tiles stuck down with bal micromax flexible grout

At the time I believed all the above was correct but I now have two hairline cracks in the grout in the shower area and one or maybe two tiles that are showing signs of movement.

Anyone any ideas what I’ve got wrong?

Thanks in advance
Slight error above!! I didn’t stick the tiles down with grout! Stuck with back flexible adhesive and then grouted with bal micromax
 

Reply to Shower area tiles lifting in the Tanking and Wetrooms Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
585
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
398
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies