Morning all,
I’m preparing to tile a 40M2 area with 15mm, light coloured limestone 400mm x 600mm. I have purchased mapei mapetex uncoupling membrane and ardex af 200 plus to stick this down. Screed is Cemex supaflow, (anhydride) laid 2 months ago, with wet underfloor heating system which will not be warmed up any time soon. Laitance has been removed. I have done many searches for the correct adhesive and there is varying advice received. I am leaning towards kerakoll h40 eco flex, purely because of the positive feedback I have came across, but all suggestions welcome. Also, I’m in Tyne and Wear, so recommended suppliers of any suitable adhesives, would also be welcome.
Thanks in advance
Chris
 

Crae48

-
Reaction score
0
Points
36
Location
Tyne and Wear
Hi Chris. Is the heating fully piped, why can’t the screed be commissioned with heat ?
Hello Dave,
This is a barn conversion I’m undertaking and the Gas services have been delayed for one reason or another. Gonna be another 6-8 weeks before I can commission the boiler and heating. The heating is fully piped and under pressure, has been since the screed went in 2 months ago.
 

Dave

TF
Staff member
Arms
Esteemed
Reaction score
389,893
Points
1,000,000
Location
Co.Durham
Hello Dave,
This is a barn conversion I’m undertaking and the Gas services have been delayed for one reason or another. Gonna be another 6-8 weeks before I can commission the boiler and heating. The heating is fully piped and under pressure, has been since the screed went in 2 months ago.

It’s taking a risk tiling a screed that hasn’t been heated. How long has the screed been down ?
 

Crae48

-
Reaction score
0
Points
36
Location
Tyne and Wear
It’s taking a risk tiling a screed that hasn’t been heated. How long has the screed been down ?
Screeds been down 2 months. I really need to lay at least one area where the kitchen units are, to allow the kitchen to be fitted. I may have to take the risk in this area if my services don’t materialise😞
 

Ajax123

TF
Esteemed
Arms
Reaction score
931
Points
1,213
Location
Lincolnshire
UFH MUST be commissioned and fun. They could hire in a temporary boiler for a couple if hundred quid from force dry Ltd. Their needs to be a moisture test and with it being limestone on heated sccreed it should be uncoupled on ditra of similar.

If you go ahead on the basis you are currently suggesting you are asking for problems
 

Crae48

-
Reaction score
0
Points
36
Location
Tyne and Wear
Thanks for the replies.
It seems the only option would be bals flexbone 2easy system. If there is a rep on here who could advise on correct adhesives and all guidelines to ensure guarantees are valid, I would appreciate the information.
Thanks in advance,
Chris.
 
P

Perfect Tiling

If its an anhydrite floor thats been down for 2 months with no heat through the UFH....its likely that its not ready to tile. Any trapped moisture could force the floor to fail...at your expense. Why let the other trades force you to do something that's wrong just so they can get on with their part of the job. If you tile it and they fit the kitchen over it and the floor then fails and needs relaid.....they won't come an remove the kitchen and refit at at their expense. As Ajax say's...it must be laid on a decoupling system being as its a natural stone floor. Iv'e never used it but BAL do a floating decoupling mat that literally sucks itself to an anhydrite style floor....see if you have a CTD local to you.....you should have...they stock it and may be able to give advice.
 

Crae48

-
Reaction score
0
Points
36
Location
Tyne and Wear
If its an anhydrite floor thats been down for 2 months with no heat through the UFH....its likely that its not ready to tile. Any trapped moisture could force the floor to fail...at your expense. Why let the other trades force you to do something that's wrong just so they can get on with their part of the job. If you tile it and they fit the kitchen over it and the floor then fails and needs relaid.....they won't come an remove the kitchen and refit at at their expense. As Ajax say's...it must be laid on a decoupling system being as its a natural stone floor. Iv'e never used it but BAL do a floating decoupling mat that literally sucks itself to an anhydrite style floor....see if you have a CTD local to you.....you should have...they stock it and may be able to give advice.
Thanks for the replies, I’m going with the flexbone 2easy 👍🏻
 

Reply to Limestone on ufh in the Tile Adhesive / Grout Advice area at TilersForums.com

There are similar tiling threads here

Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
789
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
618
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
577
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
438
Hi all! Just wondering what the best advice is for book-keeping? Been self employed now for a...
Replies
1
Views
570