Search the forum,

Discuss Limestone 900 x 600 slabs in the Canada Tile Advice area at TilersForums.com.

On the outdoor pool i'am working on they have asked me to price the pool surround and a long set of concrete steps, the concrete surround is a lot lower than the pool edge so needs to come up by about 5cm what would you guys do with fixing this job, i was thinking of screeding -up with screed then fixing with stone adhesive then sealing and pointing/grouting , there are several ways to go ! what would you do if different ? you may have a better idea than me ?.
:thumbsup:
 
900x600x20 is not too big and too slim for this method? I personally would not risk,It's easy to sound hollow after fixing.Screed and then fix with strong adhesive for me.
yes i think i will stick with screeding then Adhesive bed after ,as i'am from a plastering background , the slabs are about 25-30mm thick and look a bit fragile to me ........thanks for your advice guys.......
 

Reply to Limestone 900 x 600 slabs in the Canada Tile Advice area at TilersForums.com

There are similar tiling threads here

Hi all, I've laid some Arditex NA over the kitchen floor area (not under cabinets. The area is...
Replies
3
Views
1K
Hi, I'm new to the forum and fairly new to tiling, my only previous "proper" job was my recent...
Replies
3
Views
2K
    • Like
https://www.tilersforums.com/threads/shower-bath-tiling-preparation-plaster-and-wooden-windowsill...
Replies
1
Views
218
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

Replies you've not seen

Top