Hi, got a job coming up next week of tiling on a rapid set concrete floor with a pipe based under floor heating system fitted. Large format 600 x 900 x 20 natural stone tiles are being laid on top. Been told by the builder the concrete is being laid on the piping this Friday and I should be able to tile on it the following Monday. This seems too soon to me, especially in this colder weather. It's in a new extension and totals approx 80m squared. No heating till the UFH can be fired up. I'm worried about possible shrinkage problems if I tile on it too soon. Also not sure about possibility of decoupling / using ditra mat over a heating system.

Advice required about how long before starting tiling and should I advise builder they should put a large de humidifier in the room, cheers.
 

Ajax123

TF
Esteemed
Arms
Reaction score
931
Points
1,213
Location
Lincolnshire
Sounds like a nightmare in waiting...
 
J

J Sid

you need full spec on the concrete being put down, may need the surface sanding. As said, the ufh needs commissioning, and yes Ditra.
 
F

Flintstone

Lots of potential issues here. Need more details on the screed, but whichever screed it is it shouldn't be tiled on until the heating has been commissioned properly.
 
W

wayfoward

Thanks for your replies, a nightmare in waiting is exactly what I want to avoid being associated with. Forgot to mention that, being an extension, half the floor was old concrete (insulation issues?) and half the actual extension when I looked in 2 weeks ago. I see major issues with the floor heating crossing the two. I don't know if its the builder or a specialist who's installing the pipework.
Will advise the builder to zone floor in 2 halves if possible so floor heating is even. I should point out I just tile and know nothing about how building / heating system should be done. Just googled commissioning UFH for an idea of what's done. Came up with this:

Underfloor Heating and Screeding | The RIBA Zone | Flowcrete UK - http://www.flowcrete.co.uk/campaigns/flowcrete-and-riba/underfloor-heating-and-screeding/

Will also advise builder floor needs to be commissioned before I start tiling. Builder / customer won't like that, as I'm basically telling him / them I won't start tiling to the new year. I'm thinking ditra mat for sure now, bearing in mind all the above. Going to stop by the job this morning for a chat as I'd like to think the builder would like to avoid a nightmare in waiting too.
 

Reply to Drying time for rapid set concrete please in the Specialist Tile -Stone, Porcelain, Glass area at TilersForums.com

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
616
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
571
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
2
Views
559
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
787
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...