Search the forum,

Discuss Akw wetroom tray advice in the Canada Tile Advice area at TilersForums.com.

M

mikec200_0

hi guys I have just fitted a akw tuff form tray and Mapei tanking system to my upstairs bathroom and I am looking for some advice on the fall lines I had a tiler tell me that he would ignore the fall lines on the tray and take his fall cuts from the corner of waste to corner of wall as I looks better is this an ok practice ? Also what adhesive would you recommend it’s a porcelain tile on 6mm aqua panel on top of chipboard floor. Thanks for your advice Mike
 

Reply to Akw wetroom tray advice in the Canada Tile Advice area at TilersForums.com

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
645
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
466
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
600
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
846

Advertisement

New Tiling Questions

Replies you've not seen

Top