Discuss Wetroom floor boarding in the Tanking and Wetrooms Forum area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)




Reaction score
0
Hi all!

So I got to a job yesterday downstairs wetroom floor with mains underfloor heating (not commissioned but pressure tested) the builder has out down 12mm hardie boards to raise the floor to the existing building. The issue is the boards have been dot and dabbed on the floor and have broke away! I have told them it's not sound enough for tiling So they have been back primed the floor this time and put the boards down unlevel and also dot and dab again. My issue is it will fail if I lay on it as there are hollow pockets again and once the heating goes on its going to pop! Am I over complicating this am I right to say it needs to be corrected or would you guys recommend self leveler in stead of boards?
 
Reaction score
46
Tell them you want to prepare it yourself or you won’t do the job. Do not work on that rubbish the builder has provided.
There’s plenty of work about at the moment , no need to get involved with clowns.
 

Reply to Wetroom floor boarding in the Tanking and Wetrooms Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,365
Messages
881,187
Members
9,530
Latest member
Apatel
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks