Hi guys I was just wondering if anyone had a solution for moving tiles...? Basically I've got a client who's floor has started to move and grout crack (not laid by myself) there is ufh which I have said could possibly be damaged as tiles have been laid straight into this so they obviously want to avoid this... sub floor is chipboard and tile backer, dont think chipboard was screwed down and I'm un sure on any other prep tbh. I have scrapped out the grout and by the looks of the void looks like the tiles have been built up but was wondering if there was a product I could 'squirt' through the grout line to fill the void I know this is not right but customer wants to do anything but lift the floor...
 
O

Old Mod

How long has it been down?
If it appears built up it could well be dot and dabbed and that’s unlikely to last over ufh.
The voids can get superheated air pockets and pop tiles.
You can resin inject the floor, but by sounds of it if voids are that big it’ll cost more than replacing the floor probably.
 
Reaction score
11
Points
148
Location
Essex
How long has it been down?
If it appears built up it could well be dot and dabbed and that’s unlikely to last over ufh.
The voids can get superheated air pockets and pop tiles.
You can resin inject the floor, but by sounds of it if voids are that big it’ll cost more than replacing the floor probably.
Floors only been down 8 months
Floors only been down 8 months
But should note started cracking a few months ago
 
O

Old Mod

Floors only been down 8 months
Even higher possibility it’s been dot and dabbed then, that along with a chipboard floor, you’re asking a lot for it to stay down.

that Mapei Epojet appears to be for screed substrate repair more than anything else.
(Resin stitching)
Its viscosity would certainly allow for it to flow in to a void, but at around £100 for 4kgs it won’t take long for it to burn a massive hole in the clients pocket.
 
Reaction score
11
Points
148
Location
Essex
Even higher possibility it’s been dot and dabbed then, that along with a chipboard floor, you’re asking a lot for it to stay down.

that Mapei Epojet appears to be for screed substrate repair more than anything else.
(Resin stitching)
Its viscosity would certainly allow for it to flow in to a void, but at around £100 for 4kgs it won’t take long for it to burn a massive hole in the clients pocket.
Looks messy!! and you're right there's no way of really knowing how much it will eat up either. Thanks for the video.
 

Wayne Brown

TF
Esteemed
Arms
Reaction score
213
Points
548
Location
Norfolk
I don't think they will have any other choice but to take it up personally you could do a small section and see how bad it is ? Kop
 

Reply to Rip up job???????? in the Canada Tile Advice area at TilersForums.com

There are similar tiling threads here

Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
908
Hi all. Just wanting some advice and wondering what the pros in here are using nowadays for...
Replies
4
Views
669
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
522
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
636
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
663
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top