[ame=http://www.youtube.com/watch?v=C8hdbmjUMRc]YouTube - how to tile a floor[/ame] :8:
Discuss price work in the UK Tiling Forum area at TilersForums.com.
If the ground is all ready in level don't need :8:
you'r right once finish no turning backYou still have a level to hand to make periodic checks, its no use checking once everything is fitted.
:dizzy2:
i dont do floors like that at a normal speed. any cuts i have to do i dry fit them first, wouldnt put addy on floor then do them, what if you need to do a fine adjustment with tile or summet. he looks more like a labourer trying to do some tiling. he was applying addy with a plastering trowel by the look of it.
I agree!:8:Laying the adhesive first is not a problem at all so long as you do the cuts as you need them, There is nothing worse than laying all the field tiles and then having to do the cuts, very time consuming, finish all areas as you go.
Reply to price work in the UK Tiling Forum area at TilersForums.com
Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts