O
Old Mod
To eliminate the lip put a baton on the existing screed at the point they would need to stop to allow the last piece to be ramped to the threshold with adhesive.
If 15mm is their limit, (same as Ronafix) set a string line from the top of the existing screed to the bottom of the threshold at the low point.
Then measure the height of the string line back toward the screed to the point it measures 15mm off the new screed. That’s the point you fix a baton to the new screed for them to follow.
Hope that makes sense.
£34m2 is not actually that bad In my opinion.
By the time you take in to account materials, boards etc, and labour, plus the fact it should leave you a perfect ramped surface, I think it’s competitive.
If 15mm is their limit, (same as Ronafix) set a string line from the top of the existing screed to the bottom of the threshold at the low point.
Then measure the height of the string line back toward the screed to the point it measures 15mm off the new screed. That’s the point you fix a baton to the new screed for them to follow.
Hope that makes sense.
£34m2 is not actually that bad In my opinion.
By the time you take in to account materials, boards etc, and labour, plus the fact it should leave you a perfect ramped surface, I think it’s competitive.