Hi everyone, hoping you can shed some light on something that's happened.......
Tiling a bathroom at the moment, all walls are plasterboard but I've done the shower area out using aquaboards which were cemented to the breeze blocks and drilled and plugged.
Primed the walls with bal primer (2 coats) waited until fully dry between coats and fully dry before started to tile,
I've tiled the walls using mapei adhesive (blue top around shower area), I've gone to move the batton running along the bottom of the wall used for supporting the tiles and one of the tiles has come away.
Any idea's why?
Thanks
Tiling a bathroom at the moment, all walls are plasterboard but I've done the shower area out using aquaboards which were cemented to the breeze blocks and drilled and plugged.
Primed the walls with bal primer (2 coats) waited until fully dry between coats and fully dry before started to tile,
I've tiled the walls using mapei adhesive (blue top around shower area), I've gone to move the batton running along the bottom of the wall used for supporting the tiles and one of the tiles has come away.
Any idea's why?
Thanks