Search the forum,

Discuss Show Us YOUR Work Thread - Tilers Pictures in the UK Tiling Forum area at TilersForums.com.

Status
Not open for further replies.
C

cdstiling

Yes it is Oxistone from Ctd , The customer had already picked the tile , nice choice!
 
R

rainsco

toilet-shower room renovation.
this was the existend situation. the shower was big enouth but it makes the room to small. the customer wants a ground level shower too and they don´t like the contact point from the toilet wall to the showerscreen.
duwcre14.jpg

i suggest to steep in the toilet wall as more as possible on the right side. it was just a 11,5cm wall so we get 8cm and the rest i renderd up the wall.
we want to make a built in mirror cabinet but unfortunately there was a drainpipe down from the upper bathroom.
so we decide to make a half built in mirror cabinet.
duwcre01.jpg duwcre02.jpg

first time i made the complete concept together with a plumber (i tiled his house for a while). we convert the radiator to a underfloor heating.
i make a one day fast screed with pci novoment Z1 and my new raimondi mixer. great thing for a one man firm.
duwcre03.jpg duwcre15.jpg

format are 90x45. i set the rims with ardex x32 so when all rims are set you can begin to render.

duwcre04.jpg duwcre08.jpg

thats the emperador dark slap. it was polished so i make a lether optik surface. i use 36 and 60grid diamant brushes, then 120, 240 and final 500.
duwcre05.jpg duwcre06.jpg duwcre07.jpg

floor and walls are sealed with ardex s7. i use the schlüter drain with the tile bracket.
duwcre09.jpg duwcre10.jpg duwcre11.jpg duwcre12.jpg duwcre13.jpg duwcre14.jpg

here are the cad´s. my joiner, a friend of mine now has to build the cabinet and i decide if i make the washing stand myself (i think i will buy a router for it) or my stone mason.
duwcre00a.jpg duwcre00b.jpg duwcre00c.jpg duwcre00d.jpg
 
C

charlie1

Real nice work rainsco, hard to tell the finished result from the cad drawing! What software are you using?
 
J

jonnyc

here is a church , here is our stone fixing so far

just finished day 5 of fixing after prep work.
it is taking shape now and can see that it should look great.
stone takes some time to dry.
two french burgundy limestones
 

Attachments

  • 2013-02-18 14.21.29.jpg
    113 KB · Views: 101
  • 2013-02-01 13.58.00.jpg
    138.3 KB · Views: 91
  • 2013-01-28 09.49.27.jpg
    97.2 KB · Views: 97
  • 2013-04-08 09.18.19.jpg
    91.3 KB · Views: 94
  • 2013-04-08 15.08.21.jpg
    96.1 KB · Views: 98
  • 2013-04-13 14.45.17.jpg
    76.9 KB · Views: 88
  • 2013-04-17 11.58.25.jpg
    85.3 KB · Views: 90
  • 2013-04-17 11.59.29.jpg
    97.2 KB · Views: 88
  • 2013-04-18 15.07.14.jpg
    93.3 KB · Views: 94
  • 2013-04-18 16.21.31.jpg
    121.7 KB · Views: 86
Status
Not open for further replies.

Reply to Show Us YOUR Work Thread - Tilers Pictures in the UK Tiling Forum area at TilersForums.com

There are similar tiling threads here

    • Like
I spend some time in doorways. NOTE THAT DAN HAS CREATED THIS NEW 2024 SHOW US YOUR TILE...
Replies
8
Views
355
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top