spooner68
TF
Morning all. I have an outside tiling job coming up (800x400x10mm porcelain) on a concrete slab. The builder has built it with a decent drop and it’s pretty flat. The issue is the weather. I have been told that the base needs to be completely dry before I start as any moisture in the concrete will be locked in and when we get a cold spell it will freeze and the tiles will almost certainly lift.
Given the weather this year I’m struggling to see how I can get this done. Any advice on methods or materials would be gratefully received.
Given the weather this year I’m struggling to see how I can get this done. Any advice on methods or materials would be gratefully received.