Discuss the cost of drilling in the UK Tiling Forum area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)

P

protilers

tiler burden.......sometimes things are worth paying for....like drill bits,lasers and websites.......:lol:
p.s thanks for the compliment!
850 range all the way......the others are just like common ptc's
 
Last edited by a moderator:
T

tiler burden

your right there mate..you can also add lithium ion batteries for your cordless kit to the list aswell
 
Last edited by a moderator:
B

bigdaz

looks like I'm going to have to shell out for some diamond bits then :icon9:
its all pay out in the beginning. So does anyone use those arrow shaped tungston carbide bits?
 
T

tiler burden

dont worry baz

buy the 365dills and use them until the money comes in. just break the cost of the bits down on say 2 bathrooms, that way you'll at least break even..

its just in the long term the marcrist are the best thats all mate

ed
 
D

Deleted member 1779

A set of diamond drills will cost £50 quid and this cost should always be passed to the customer as a consumable. Kits are designed for use on very hard porcelain but will actually cut hundreds of holes in ceramics.

Ceramics are so soft they do nothing to the drills.

As part of every bathroom install you will have to drill some holes as part of the installation of any bathroom to fit the tiles. IE radiators, waste pipe.

a4.jpg


Fixtures are actually part of the tiling job so there is nothing you can do about that. But FITTINGS are a different matter.

In our kit the drills for FITTINGS come as part of the kit and so you could always leave the rest of the kit with the customer to use for themselves (especially if you add the cost of the drill kit to their invoice as a consumable)

bfk.jpg


A BFKMX Kit is supplied with drills for the fixures (the drills behind) like radiator pipes, waste pipes, shower heads.

But also supplied with drills for the fittings (the drills in front) like mirrors, loo roll, shower screens,

BFKMX1.jpg


At the end of the day its between you and the customer to work out where the job starts and stops. Knowing that customers would like a loo roll attached etc means you can now mention it right at the start of every quote.

You can offer to leave the drills with them to finish themselves at a cheaper cost, or add more time to do all the snagging and fixing. Hell if they pay enough money you could hang the towels, run the water, light the candles and sing "oh happy day.." while they use take their first bath!

My mate Andy is charging £5k per bathroom for a complete job start to finish and that includes snagging, cleaning, priming the radiators, plumbing, lighting, waste etc etc
 

Reply to the cost of drilling in the UK Tiling Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Please visit our sponsor websites, they keep the forum free to use!
Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,365
Messages
881,187
Members
9,529
Latest member
Dawz84
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks