LM

If it's fitted correct then it would be ok but I find the plumbers leave too much silicone on the top edge & leaves you with a lip at the bottom of the tile.
I don't find that an issue, maybe because I've explained to all the plumbers I work with exactly how I want the classi deal fitted and so far so good:)
 
O

One Day

Boarded and waterproofed in about 4 hrs (photo shows not finished).
I charged a lot more than 200quid for the prep though!

20160714_153725.jpg
 
Reaction score
495
I charge £50 above a bath and £90 for 3 sided shower for materials. Labour is £40 for a bath and £60 for shower enclosure walls. I personally prefer to install Marmox boards (and Marmox waterproof tape for joints up to 1.2 metres above bath/ tray). Favourite tanking kit currently is Tilemaster, but it depends where I buy materials, regularly use BAL and Ardex systems.
 
S

Stef

I don't find that an issue, maybe because I've explained to all the plumbers I work with exactly how I want the classi deal fitted and so far so good:)
I've not been that lucky, I had to cut one out as it was sticking out the wall about 6/7mm
 
F

Flintstone

Half 8, prime it, cut the tape to length, by 9 your tanking, half 10 your out the door
 
H

hmtiling

Half 8, prime it, cut the tape to length, by 9 your tanking, half 10 your out the door
Some tanking kits specify 2 coats and for the first coat to be touch dry, so 4 hours is about right for that. 2 hours about right for one coat.
 
F

Flintstone

I use tilemaster kit and that's a 2 coat job, first coat dries to touch within 10 mins! Not sure about other brands
 
S

Stef

That is Mapegum & you couldn't do it in 2hrs as you need to wait till the 1st coat is dry.
I never go to a job just to tank a shower, it's done in conjunction with other jobs.
 

John Benton

TF
Arms
Reaction score
2,214
Tilemaster is 4 hours before tiling so tiling in 2? I wouldn't do it personally. I try to put my 2nd coat on last thing so I can start tiling first thing next day.
 
Reaction score
495
That is Mapegum & you couldn't do it in 2hrs as you need to wait till the 1st coat is dry.
I never go to a job just to tank a shower, it's done in conjunction with other jobs.
Yes, if at all possible. I usually fit this to the prep day, or floor tiling day. In a whole bathroom tiling, you can do at least 2 walls to fill in the rest of the day.
 
F

Flintstone

Tilemaster is 4 hours before tiling so tiling in 2? I wouldn't do it personally. I try to put my 2nd coat on last thing so I can start tiling first thing next day.

I never said you could tile it in 2, I said it would take two hours.
I always tank the day before
 

Reply to Tanking price in the Tanking and Wetrooms Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,371
Messages
881,207
Members
9,534
Latest member
Lowpaul22
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks