S
shongu
Hi Everyone,
It was a long time I posted here, but always found good advice all the time.
I need some help on a bathroom where UFH going down.
The substrate at the moment is 22mm chipboard. In their specs they want to go over the chipboard with 6mm WEDI screwed, then electric UFH, I would go with SLC on top and ADH with the tiles.
Could you advise if this would be the the best order. or any better way to do it? Any advice would be very helpful.
It was a long time I posted here, but always found good advice all the time.
I need some help on a bathroom where UFH going down.
The substrate at the moment is 22mm chipboard. In their specs they want to go over the chipboard with 6mm WEDI screwed, then electric UFH, I would go with SLC on top and ADH with the tiles.
Could you advise if this would be the the best order. or any better way to do it? Any advice would be very helpful.