Search the forum,

Discuss East Manchester - 2/3 Days Tiling Bathroom Walls & Floor in the Tiling Jobs | Find a Tiler - Post Tiling Work Here area at TilersForums.com.

O

olly330

I'm from droylsden mate where in tameside are u


Hi, its in ashton, send me a pm with your number if you want to have a look mate.

Bath is higher than usual as need to create a drop for the waste as it has a fair distance to travel.

Taps not on as didn't want them to get any adhesive or mess on during the tiling.

The no more ply are now screwed down and shower/bath walls are now tanked.
 

Reply to East Manchester - 2/3 Days Tiling Bathroom Walls & Floor in the Tiling Jobs | Find a Tiler - Post Tiling Work Here area at TilersForums.com

There are similar tiling threads here

10 Tiling Tips for Fixing Tiles to Bathroom Walls = From UKTilingForum.co.uk There are a few...
Replies
1
Views
703
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
456
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
642
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
596

Advertisement

New Tiling Questions

Replies you've not seen

Top