G

Gazzer

If you were working for a small builder ( maybe a sole person) who was buiding one or two houses on a plot of land. Would you expect the basic items such as runing water, electric point and a Loo to be readily available on site?. I do, but in this country it seems it isnt always the case. Last week i was working for a regular builder as i have for the last 8 years and when arriving on site i found that there was no water, no power and no parking ( Site was alongside a main road and the driveways were being block laid at the time.
Now a few years back i had the fortune to work in Melbourne, Australia for 15 months and every new build site i went on had its own power point and stand pipe (you had to carry your own tap to screw in) You would also have the house to yourself until you had finished and no other trade was allowed in until you had finished.
I reallly dont think its much to ask ( power and water) So do you think they should be supplied?
I was told that water was available by asking one of the neighbours to use their outside tap and if i needed power i would have to get a generator. I had to get the water but i managed without power. So i have wrote a letter explaining my terms in future and await their response.
I do think that British building sites and building standards are falling behind, what do you think?
 
F

floydyboy

yea i agree with you Sir Ramic, there are health and safty laws in place but unfortinatly the small builders do not always folow them due to cost a canteen should be supplied anything over 2-3 houses as far as water is concerned well that is infuriating being a plasterer we get through gallons of the stuff and is no joke when you got to ask neighbours, and as for a toilet and leky that is a must and the sooner the local authorities start pushing these guidelines the better.but my exsperience with small builders they all say it is ready for you when you get there its like a bombsite and loads of tradesmen under your feet so as a rule i tend not to do it anymore not worth the hastle
 
W

wetdec

You spend to much time working its the country thats falling behind not just the sites.

I dont think basics are much to ask but yrs ago we didnt expect like we do now for some reason.

When I began sites I learned 2 valuable lessons, you never pick up someone elses tools and you bend to accomodate other trades men. If you have no power, water etc neither do they its the one place that you must work together or get no where.

tiler


..
 
F

floydyboy

You spend to much time working its the country thats falling behind not just the sites.

I dont think basics are much to ask but yrs ago we didnt expect like we do now for some reason.

When I began sites I learned 2 valuable lessons, you never pick up someone elses tools and you bend to accomodate other trades men. If you have no power, water etc neither do they its the one place that you must work together or get no where.

tiler


..
Water is an essential item on a construction site and SHOULD be supplied at all times and years ago there were hardly any power tools being used on sites so i agree with you there there was not much call for leky on the site but in this day and age the amount of power tools being used i would say it is a vital and not only that the neighbours don't thank you when you start a noisy geny up outside
 
G

Gazzer

Oh i am fully kitted out for every eventuality but how the hell have they built 2 detatched houses without water ???
Power, yes i have a genny but i would charge them for the fuel because its another expense.
And, yes working tempretures ??? How come that a lot of teh builders i work for (esp the larger companies) are banging on about health and safety, CSCS cards, and NVQs but when it comes to sites freezing up (as they did earlier this year) they still want the tiling done. the want the tiler to have NVQ but still wont listen to their advise when the tiler says a surface isnt suitable.
I could go on all day about the health and safety aspect but i wont, i am sure we all know the score there.
I really do think that the british building trade is falling behind the rest of the world, having seen other countries working and making it work...why cant we? TOO MUCH BULL 5HIT thats why. rant rant rant
 
M

MrSpoon

im currently working on site and i didnt find the water supply till the afternoon of the second day, i got a few "points" when i asked other people where it was but ended up dipping my bucket into some dirty water beforehand, as for emptying th crasp out i still havnt discovered this muck pile that im told about and i just get told to empty my crap onto the floor as it'll be covered at a later stage anyway, as for other tradesmen there, theres sometimes only me in the particular appartment at a time and sometimes up to 6, tools/supplies are piled into the middle of the rooms and thats about it, oh and ive found that no matter how much i want to listen to radio 1 (well it only picks up radio 1 and classic fm), someone will always come in with their nice big dewalt site radio and put on radio 2, drowning out mine. so i switch mine off, thne when they;'re done whatever they are doing they take their radio with them, so i have to get up and retune the radio to radio 1.... then 30 minutes later someone else will appear with a radio playing radio 2 etc etc.. its a vicious cycle:yes:
 
P

pjtiler

im currently working on site and i didnt find the water supply till the afternoon of the second day, i got a few "points" when i asked other people where it was but ended up dipping my bucket into some dirty water beforehand, as for emptying th crasp out i still havnt discovered this muck pile that im told about and i just get told to empty my crap onto the floor as it'll be covered at a later stage anyway, as for other tradesmen there, theres sometimes only me in the particular appartment at a time and sometimes up to 6, tools/supplies are piled into the middle of the rooms and thats about it, oh and ive found that no matter how much i want to listen to radio 1 (well it only picks up radio 1 and classic fm), someone will always come in with their nice big dewalt site radio and put on radio 2, drowning out mine. so i switch mine off, thne when they;'re done whatever they are doing they take their radio with them, so i have to get up and retune the radio to radio 1.... then 30 minutes later someone else will appear with a radio playing radio 2 etc etc.. its a vicious cycle:yes:
thats ageist!!!!
i shall be writing to terry wogan immediately:furious3:
 
M

MrSpoon

ive never even been in the canteen, dont have the free time, only ever eaten my sarnies once and that was while was working. mobile phones i presume arent allowed but i hear them going off all the time and when asking the guy in charge he just said they arent supposed to be used but nobody listens, as for radios, they are fine aslong as others nearby are ok with it, dont even have to wear my hardhat when im in my room tiling, so quite often i go outside without it on then swiftly turn back round to go back inside to put it on again
 
M

MrSpoon

on the second day i did infact take my own water and mixed up bagged stuff with a hand paddle thing :joker: and i had my first case of other tradesmen getting in the way today so a very slow day, and to top it off i had to leave early to get to my other job, and... i had to pluge cut using my master tiler, i can honestly say ive never created so much mess in all my life, i got more in my eye than anywhere else :mad2: so a trip to the van with a J cloth to fish out the sharp bits.

word of advice, dont buy eye protection that has a sporty look cos theyre just plain useless, ive gone back to the big ugly ones, but my eyes are safe so thats all that matters :thumbsup:
 
B

bigneil

It is a bit difficult to work without power and water, if there is none avaliable and your site agent won't help out with a generator then politly sugest that he/she calls you back when they are a little bit more organised. and if they don't, then, it just means that some other poor sod went and cut round all the sockets with a pair of nippers and used freezing water from the nearest stream. While you are on an other job with power, running water, and a kettle with a tall blonde sweedish nymph to make the tea for you.
 

Reply to A general building site question. in the UK Tiling Forum area at TilersForums.com

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe had worn away over the past 70 years, causing a small crack in the copper. A plumber/builder fixed...
Replies
1
Views
865
    • Like
https://www.tilersforums.com/threads/shower-bath-tiling-preparation-plaster-and-wooden-windowsill.83462/#gsc.tab=0 There was some heated argument in the above thread! I don't have much...
Replies
1
Views
362
    • Like
  • Sticky
Water Damaged Shower Repairs Shower tile repair – water damage – tile waterproofing Do you have shower leakage that goes downstairs leading to either your main floor or basement? Read this blog...
Replies
0
Views
2K
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.

Advertisement

You're browsing the UK Tiling Forum category on TilersForums.com, the tile advice website no matter which country you reside.

Top