Time's Ran Out

64BF625D-FD60-4655-BDC1-EC44848CB8F7.jpeg 46D0AE0B-772B-4399-9B48-A6D3551CA45A.jpeg D82137D2-F060-4C32-BC24-38C90289BE70.jpeg DF28B29A-F36C-4983-A705-8B0C4DB31A76.jpeg 64A7326A-CADB-4CA7-B0C0-E6B486818EF8.jpeg AE05DAC1-BCA4-4D0B-8806-2751D6BA839F.jpeg These photos are not DIY OR ROGUE TRADERS.
The company have been trading 25 years apparently !
I was ill so they got a squad in and this is on £1 million apartments - all sold- but now I’ve been asked to try and salvage something. I’ll give them 3 days then that’s it!
 
W

willywinki

Came home to this mess last night. Totally and utterly gutted.

Window reveal is a total mess, tiles on the ledge cut short and the gap stuffed with grout. Tiles not flush with trim anywhere. None of the trim is straight/level, stepped tiles, messy/jagged cuts, chipped corners, gap at top of wall again stuffed with grout.
IMG_20180327_195825590.jpg
IMG_20180327_194539935.jpg
IMG_20180327_194524215.jpg
IMG_20180327_194556621.jpg
IMG_20180327_194634256.jpg
IMG_20180327_194857320.jpg
IMG_20180327_195803781.jpg
IMG_20180327_194917891_BURST000_COVER_TOP.jpg
 
W

willywinki

He's had £1000 deposit as they were doing the full bathroom re-fit. We supplied all bathroom fixtures, tiles, adhesive, grout and trim.
We had stripped the room and removed all the old tiles. They supplied plumbing stuff.

They have reboarded two of the walls (room is 2.5 x 2m), installed new plumbing for over-bath shower, moved bathroom tap and bath waste, sunk pipes/waste into wall for wall hung vanity sink, moved plumbing for towel radiator and fitted bathroom suite.
There are still issues with the bathroom itself including. They didn't fit the bath against a wooden frame so once full it's drops. Even though they tiled off the bath edge, they tried telling us we needed tile trim(!) along the edge as it gives a better finish, silicone bead would look messy. The bath side panel is loose. They siliconed along the bottom of the bath panel/floor. The silicone is messy and made worse by the bath panel moving before it went off. LOADS TO PUT RIGHT!
 

John Benton

TF
Arms
Reaction score
2,214
There’s everything to put right, trim around bath as silicone looks messy!!!! How do they think trim will stop water?

Is it through a showroom that you employed these cowboys?
 
W

willywinki

[QUOTE="Is it through a showroom that you employed these cowboys?[/QUOTE]

No, it was via MyBuilder....They had loads of great feedback. We had four companies quote and they were the the second most expensive. He wanted to come back and fix things today....including PVC window trim to cover that ugly *** chunk of grout on the window ledge.....Not a chance!!

The worst of the tiling on the window wall, around the boxed in cistern. Would it be a big job to take those tiles down and re-do it bearing in mind you'd have to work round the now installed bathroom?
 

Reply to Public Thread!: Poor Tiling Workmanship by DIY and Rogue Traders in the Canada Tile Advice area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

There are similar tiling threads here

Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
725
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
380
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
571
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
521
This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Tile Contractor Forum. The useful tile contractor website.

Replies you've not seen

New Tiling Questions

UK Tiling Forum Stats

Threads
67,345
Messages
881,157
Members
9,536
Latest member
Bob Marley
Top