Search the forum,

Discuss Next Project! in the DIY Tiling Forum area at TilersForums.com.

Reaction score
21
Points
423
Location
N. Ireland
Going to change plan!

Eco prime t as far as I know can only be bought in larger containers and as I'm only tiling 2/3 metres I don't want to pay that much and then throw it out! It is quite expensive!

Reading between the lines of this thread I've came to the following conclusions

- if I can remove 100% of glue I don't need a slurry coat and I can use any SLC ( doesn't have to be two part)

So I can sbr and use slc and then tile.

- if I can't get 100% of the glue removed I can either slurry coat and use any SLC and then tile

Or

Use a two part SLC n then tile

Am I correct in this?
 

Rich Midge

TF
Esteemed
Reaction score
396
Points
598
Location
Liverpool
Going to change plan!

Eco prime t as far as I know can only be bought in larger containers and as I'm only tiling 2/3 metres I don't want to pay that much and then throw it out! It is quite expensive!

Reading between the lines of this thread I've came to the following conclusions

- if I can remove 100% of glue I don't need a slurry coat and I can use any SLC ( doesn't have to be two part)

So I can sbr and use slc and then tile.

- if I can't get 100% of the glue removed I can either slurry coat and use any SLC and then tile

Or

Use a two part SLC n then tile

Am I correct in this?
Yes.
 
Reaction score
21
Points
423
Location
N. Ireland
And the Saga continues!

Went to tile shop number 1

Had no two part leveler or standard set adhesive and when I asked for sbr he asked me what that was! He then told me to try tile shop number two!

Tile shop number 2

Asked for leveller adhesive n primer

Brought it all out from back n put it in the car.

So I come home happy n inspect my purchases!
He'd given me a latex smoothing compound to bed trowelled on. So dubious of my trowelling skills I wasn't amused but thought lets try this!

Back to the floor, I taped up the door n got to work with my grinder to clean the remainder of the glue off. Went over the full floor and inspected after, all it really did was smear it around. So started to scrape again!

Scraped an hour and getting more n more annoyed, I read the instructions on the smoothing gear. It said can be applied over non soluble residue but no bitumen! My knowledge of glue residue being very slim injust got confused and angry! Boiled the kettle to try heating the glue n to my surprise it turned it white and made it bubble up and Easy?! to scraclean. I scrubbed the floor clean using clean water n left it to dry out.

I then decided to use the leftover SLC from my living room so I could pour it rather than trowel it. Primed the floor and out on the SLC and that's where I'm at now!
 
Reaction score
21
Points
423
Location
N. Ireland
image.jpg
image.jpg
image.jpg
image.jpg image.jpg image.jpg image.jpg image.jpg
 
L

LM

And the Saga continues!

Went to tile shop number 1

Had no two part leveler or standard set adhesive and when I asked for sbr he asked me what that was! He then told me to try tile shop number two!

Tile shop number 2

Asked for leveller adhesive n primer

Brought it all out from back n put it in the car.

So I come home happy n inspect my purchases!
He'd given me a latex smoothing compound to bed trowelled on. So dubious of my trowelling skills I wasn't amused but thought lets try this!

Back to the floor, I taped up the door n got to work with my grinder to clean the remainder of the glue off. Went over the full floor and inspected after, all it really did was smear it around. So started to scrape again!

Scraped an hour and getting more n more annoyed, I read the instructions on the smoothing gear. It said can be applied over non soluble residue but no bitumen! My knowledge of glue residue being very slim injust got confused and angry! Boiled the kettle to try heating the glue n to my surprise it turned it white and made it bubble up and Easy?! to scraclean. I scrubbed the floor clean using clean water n left it to dry out.

I then decided to use the leftover SLC from my living room so I could pour it rather than trowel it. Primed the floor and out on the SLC and that's where I'm at now![/QUOTE
well eventually your getting there, you seem to be on the home straight now
 
Reaction score
21
Points
423
Location
N. Ireland
Laid the tiles on Sunday, I primed the SLC, wasn't sure whether to or not but thought it (hopefully!) Couldn't do any harm.

8 hours! It took me to tile slightly over 2 metres! From starting to plan layout till tools away. Ungrouted!
 
Reaction score
21
Points
423
Location
N. Ireland
I centred the tiles to the room. Looking at the doorway into the kitchen would I have been better to move the floor up a few cms to make the tiles more symmetrical in the door jam?

I was undecided but decided to go with the centred room plan
 

Reply to Next Project! in the DIY Tiling Forum area at TilersForums.com

There are similar tiling threads here

    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
499
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
622
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
656
Hi all! Just wondering what the best advice is for book-keeping? Been self employed now for a...
Replies
1
Views
604
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top