B

Bill

Of the photos posted so far - where are the misaligned mosaics that would not be in a tolerance +/- with BS?
 
N

Nick Jones

Nick, I feel for you.


However, do you have some pics of the overall bathroom? (I’m sure you have!). Close up pics are fine, but we need to see the overall picture.


I think we can all agree that the quality of the finish is unacceptable. All areas of the work need a good washdown to remove excess grout and grout haze. Some areas need re-grouting. Some areas need grouting. All internal joints need siliconing.


You will need a professional tiler to visit, as the problems may not just be on the surface. Do you know how the builder fixed (stuck down) the tiles? There may be hollow voids under the tiles.


You may be lucky and get a good tiler to come in for a day and sort out these issues.


Have you paid this bloke?


p.s. I know what you mean about the mosaics. They ARE misaligned. This IS the fault of the person who stuck them to the wall.
Unfortunately I don't have pictures of the whole bathroom. My mobile phone is the one I bought in, I think, 1990 and it doesn't take photos. Amate had come round to have a look, and he kindly took the photos. And he also kindly cleared out my kitchen sink waste and the drain outside of all the grout and what-have you that the contractor put down the drain. (I have pictures of those, if anyone's interested!).
I don't know about his tie fixing, but what I do know is that several tiles are not flush with the neighbouring tiles. That suggests to me that there may be excessive adhesive under those areas, with the possibility I suppose, of voids in that the adhesive he spread with the notched float has been m0ved round by him when he applied the tile.
I have paid half his bill - that covers the trades he paid and gives him a week's pay (at his normal daily rate) for the building work of knocking down a couple of small walls and the construction of some stud walls to accomodate wall hung w.c., bidet and handbasin.
The position is rather complicated and unpleasant. He has been working for my employers for 3 + years. As the Accountant/Book-keeper I see every invoice from him - hence I know his normal daily rate, and I know how much time he has spent on the compan's work (and hardly anything in his own right). Because the company did not have any work for him for the first couple of weeks in January, and I had been waiting for such a time (to help out my employers, and this guy) so my "project" was scheduled. I actually expected him to go that little bit extra as we were work colleagues and I had known him for over 3 years. I am so disappointed. You cannot believe how appalled I feel, that my trust (yes, I say trust) has been wrecked by this individual. I say again, if I wanted a poor job, I could have done it myself - but I think my results would have been better than his.
 
N

Nick Jones

Of the photos posted so far - where are the misaligned mosaics that would not be in a tolerance +/- with BS?
They are all over the place. I see more every time I look.
You can see the difference in joint width - unfortunately I haven't got round to document properly this aspect of the poor job yet.
I thought I'd also add a couple of pics - one of the fact that he couldn't even fix a door handle vertically, and others of the grout in my waste pipes as well!

20180208_104329.jpg 20180208_105328.jpg 20180208_104634.jpg 20180208_120239.jpg 20180208_120252.jpg
 
N

Nick Jones

I know the TTA offer such a service but having just looked at the cost you could have the room retiled for less!!
Sorry I didn't reply earlier. Like you, I was horrified at the rates - my bathroom would fall into the "up to 50M2" category at £ 980 + VAT. I am trying another route with them where they talk of a desktop report based on pictures. Per their website, I spoke with them and sent off the pictures. I'm waiting to hear back from them and I'll let you know what happens, and what the cost would be.
 
T

Time's Ran Out

Give him a snagging list!
I don’t think there is anything on view that requires an independent assessment .
 
N

Nick Jones

Give him a snagging list!
I don’t think there is anything on view that requires an independent assessment .
I'm sorry I don't agree.
Firstly, I would not employ the person who did this work to carry out remedial work. If he can't do the job well enough in the first place, what value can you place on the quality of any further work.
Secondly, he denies that there is anything wrong. He thinks he's done a good job. Any remedial work would be of the "sweep it under the carpet" variety - like an extra large amount of sealant to cover up the problems, but not to fix them.
Thirdly, the snagging list would be simple. Rip it all out and get a professional tiler in to redo it.
Who knows what problems exist under the surface, as has been suggested already.
The work is simply not good enough. Likewise, as a tiler this contractor is not good enough. If am paying for work, then it is only reasonable for me to expect quality work.
 
N

Nick Jones

If you don’t give the original tiler a chance to rectify the work ie give him a list of all items you are not happy with then IMO you don’t stand any chance of compensation.
I told him that I did not think that the work was up to scratch.
He did not like that.
He said "I can't be arsed" and that he'd "take what I was going to pay him and leave it at that".
My interpretation - he quit. He walked off the job. Subsequently, he appears to regret that "terminology was used out of context on my behalf due to feeling surprised at your reaction to my work. I have worked tirelessly to complete and achieve your deadline for completion". The job has not been completed. The deadline for completion was not achieved.
He wanted to come round to look at the work - I agreed.
He turned up with his mate (without having said anything about this beforehand) who he said was a tiling contractor
I had hoped that this might mean that he was going to propose that this guy did remedial work (because he was on another job at the time), but no - his mate proceeded to tell me that it was my fault because I had supplied the materials, that it was my fault because of the joint width I had specified, etc., etc., ad infinitum.
I don't know what he had intended to achieve, but when it's a 2 to 1 situation in one's own home ... and there is nothing constructive about the meeting.
 
D

Dumbo

What joint width did you specify . What was the timescale . Did he originally want longer . Ie washed he pushed or not .
I think there is more truth to come from this but don't get me wrong I'm not saying it is a good job but there may be mitigating circumstances that may affect you that we haven't heard .
 

Reply to Independent Tiling Consultant needed in the The Welcome Forum area at TilersForums.com

There are similar tiling threads here

Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
968
    • Like
A little help guys. I've been asked to price 71sqm of limestone flooring. My issue is this...
Replies
2
Views
270
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
689
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
691
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top