Search the forum,

Discuss How long to wait until tiling onto 75mm screed in the Canada Tile Advice area at TilersForums.com.

D

Dumbo

Yeah doesn't mean it couldn't be though.
It's the most commonly used screed these days over UFH And builders as we know don't always follow the rules.
Could just be a fibre reinforced screed but Id want to be sure what I'm dealing with before laying anything.

In answer to the original question With UFH commissioned and running It's possible to dry it out in about two weeks
You shouldn't force dry s&c screed
 

Sean Kelly

TF
Arms
Reaction score
647
Points
1,068
Location
Ruislip
If time is an issue and cost is not an issue then use Ardex A38 (Ultra Rapid Drying Cement for Internal & External Screeds).

Screed the floor and tile after 4 hours. I believe it works out at 1.5 times more than the cost of normal screed.

I have not used this product myself, I got the info from asking the Ardex reps at a trade day.
 
A

ashurst

Sorry for not replying earlier to clarify.

It will be a sand and cement mix. I honk I will go with the 21 days and ditra or similar. Bal do something called rapid Matt and it's only 1mm thick whereas ditra seems to be 3mm thick. Similar prices. Which should I use ?
 
N

NZ_Tiler

Generally what moisture content should screed have if a decoupling matt is going over?

Would it not be similar to tiling?

IMO 21 days for a screed that thick is not long enough with regular sand n cement.
 

Reply to How long to wait until tiling onto 75mm screed in the Canada Tile Advice area at TilersForums.com

Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top