Search the forum,

Discuss Bad job or unavoidable? in the America Tile Forum area at TilersForums.com.

Reaction score
1
Points
38
Location
Newmarket UK
To me it looks like !what happens all too often , a plumber has also been involved in the new bathroom , as capped pipes in picture , it's very easy for criticism, but we don't know budgets etc etc !! Is a builder involved , it's not right that walls are wrong , but who was responsible for preparation??
Doesn't detract from the fact that whoever tiled it didn't do a good job. If the plumber left capped pipes to tile around then that's fine and in ideal world, just what you want..... The tiler should have checked the room for plumb before doing anything, in this case as the walls are waaaay off plumb he should have let the client know before just going ahead and starting the job...... I mean, that's what is meant by professionalism.
 

Kevbos

Arms
Reaction score
35
Points
443
Location
London, UK
Doesn't detract from the fact that whoever tiled it didn't do a good job. If the plumber left capped pipes to tile around then that's fine and in ideal world, just what you want..... The tiler should have checked the room for plumb before doing anything, in this case as the walls are waaaay off plumb he should have let the client know before just going ahead and starting the job...... I mean, that's what is meant by professionalism.
A professional plumber would have also brought this up as usually its there job as s whole
 

Kevbos

Arms
Reaction score
35
Points
443
Location
London, UK
A professional plumber would have also brought this up as usually its there job as s whole
And what I mean is , do we know if there is a builder , or plumber etc who's job it is ? Do we know the circumstances of the tiler doing the job , because if it is someone else's job , the tiler may have been told to just tile it , ideal world situations are great if they work , but if you book in 2 or 3 days to do a job !turn up , walls are not great ,then told to do best you can ! Which does happen , a situation arises , you go home have 3 days off , or raise problem with the builder or plumber etc , if they are not willing to rectify walls , what do you do ?? Go to customer who essentially not your customer and raise issue !! Lose all future work with builder plumber or do as you are told ?? Unfortunately there are to many poor trades out there
 

Kevbos

Arms
Reaction score
35
Points
443
Location
London, UK
A professional plumber would have also brought this up as usually its there job as s whole
Essentially it's a bad job !! But we don't know all circumstances , and I was just lucky to mostly work alongside great plumbers and builders , who also knew I would not tile over poor preparation!!
 

Reply to Bad job or unavoidable? in the America Tile Forum area at TilersForums.com

There are similar tiling threads here

    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
486
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
607
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
860
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
648

Advertisement

New Tiling Questions

Replies you've not seen

Top