In my last job I found this wedi shower floor.
first time i see wedi, i've done a couple of schluter before
but it was also on the walls.
here, the walls are sand and cement and I have to impermealize.
how should I behave with the connection between walls and floor panel?
just a band glued between the wall and the panel?
or do I have to do anything else?
unfortunately here we are still primitive with these products, already find a wedi panel
and not having to make sand and cement on the floor is new.
thanks
In my last job I found this wedi shower floor.
first time i see wedi, i've done a couple of schluter before
but it was also on the walls.
here, the walls are sand and cement and I have to impermealize.
how should I behave with the connection between walls and floor panel?
just a band glued between the wall and the panel?
or do I have to do anything else?
unfortunately here we are still primitive with these products, already find a wedi panel
and not having to make sand and cement on the floor is new.
thanks