P
Part-Time Tiler
Hi everyone, I am about to tile a shower enclosure and the plumber has removed the old shower base and replaced with a new one but it is set lower than the previous one so there is a hole in the plasterboard all around the shower base and you can see the egg box behind it. The rest of the plasterboard is intact and I know replacing paramount plasterboard is a lot of work so is there a way I can just patch it up and then tile over it.