Search the forum,

Discuss Palace Heat Resist Adhesive in the Tile Adhesive / Grout Advice area at TilersForums.com.

Nwozza

-
Reaction score
0
Points
36
Location
Doncaster
Does anyone have much experience of working with Palace Heat Resist Adhesive? I'm just about to tile a fireplace with it for a log burner but I've noticed that on the tub it says it will 'take up to 14 days to develop full adhesion and should not be exposed to radiant heat during this time'. That seems a crazy long time! Are there better products out there? Will I be OK lighting the fire sooner? I've searched the Internet for any clarification but I can only find generalised info stating 24-48 hours.
 
I

Ian Buc

Hi, im wondering the same thing after just fitting tiles, how long did you leave it in the end?
 

Reply to Palace Heat Resist Adhesive in the Tile Adhesive / Grout Advice area at TilersForums.com

There are similar tiling threads here

Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
787
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
616
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
571
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
435

Advertisement

New Tiling Questions

Replies you've not seen

Top