Finally, all the plumbing / re routing is finished. It's all tested too. Shower turns pump on, no leaks anywhere (touches wood)
Pipes done, just sorting some extra wiring / tidying up the old stuff too. Previous installer had it running everywhere and not clipped anywhere!
insulated the hot water pipes too. Have left the cold and shower waste pipes. Had to add a few noggins to support the edges of where the plywood will meet and the perimeter of the marmox wet room tray
Next I layed some insulation in between the joists. Not over any cables now they have been tidied up and clipped to the joists. HOW ITCHY! very itchy!
Started to prime the underside and edges of the WBP ready to lay
WBP now fixed. Every 150 centres. Used a lot of screws!
Most of the electrics now in, apart from some final clipping, I should be ready to test / set up the dry deck once ive fixed the wet room tray/gulley. Added a light in the cupboard aswell that comes on when door opens as it was getting dark in there!
next step.. laying the marmox boards and tanking!