Evening folks
I am about to tile a bathroom floor inc, Impey wetroom tray & UFH.
The work up until now has been carried out by someone else and this is where its at.
The floor at present is standard chipboard with the tray being approx 2-3mm proud. I need to run the loose lay cable UFH and encapsulate in a screed. The issue is that the customer wants the UFH in the shower area as well but I can't screed it as it is a center drain. I am pretty sure there is a tanking membrane to go down as well.
So do I run the cable on the floor & tray but only SLC outside the tray then encapsulate cable in the tile https://www.tilersforums.com/forums/tile-adhesive/?
Also Is it best to lay the membrane first?
Any advice would be greatly appreciated!
Many thanks
I am about to tile a bathroom floor inc, Impey wetroom tray & UFH.
The work up until now has been carried out by someone else and this is where its at.
The floor at present is standard chipboard with the tray being approx 2-3mm proud. I need to run the loose lay cable UFH and encapsulate in a screed. The issue is that the customer wants the UFH in the shower area as well but I can't screed it as it is a center drain. I am pretty sure there is a tanking membrane to go down as well.
So do I run the cable on the floor & tray but only SLC outside the tray then encapsulate cable in the tile https://www.tilersforums.com/forums/tile-adhesive/?
Also Is it best to lay the membrane first?
Any advice would be greatly appreciated!