Discuss Preparation on to floor ready to tile in the Canada area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)

Simons70

TF
Esteemed
Arms
Reaction score
603
We do the tiling inside this house and we agree to do even outside when the builder finish to prepare the job for us.
We find all done wrong,the water go in the wrong places on both surfaces,need rip out 30 mm screed in some places and add 60-70 mm new screed .Tiles is 800x800,''easy,just add some more adhesive if need'' IMG_1966.JPG IMG_1968.JPG IMG_1971.JPG IMG_1975.JPG IMG_1979.JPG IMG_1988.JPG
 
D

Dumbo

I had one builder put in a screed level for me to put free length limestone on it. He reckoned it wouldn't puddle .
Edit . And it was pillow edge .
 
Last edited by a moderator:
F

Flintstone

Still looks too rough to be tiling on to me! Can see your having to bed them up
 
Last edited by a moderator:

Reply to Preparation on to floor ready to tile in the Canada area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Tile Contractor Forum. The useful tile contractor website.

New Tiling Questions

UK Tiling Forum Stats

Threads
67,360
Messages
881,156
Members
9,532
Latest member
Matthew77
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks