W
WetSaw
No empty adhesive sacks in the rubbish?
Discuss Kitchen refit gone wrong (poor tiling) in the Australia area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)
1/4 ply is to thin . British standard for ply overlay is 15 mm glued and screwed at 100mm centres .So, a wee update (Thanks to those who replied)
Tiler came over on Friday, he then heard first hand the noise coming from the tiles...He couldn't explain it. I just got a blank look when I asked why the tiles were running off in several places.
Had a bit of a ding dong on the phone with the joiner, who is still of the opinion it's a decent job. He's saying they used 1/4 ply, screwed at 100mm centres.
He then backed down a bit saying he'd get the tiler to replace any tiles i'm unhappy with (only about 99% of them !!), to be honest i've no idea where you'd start & finish with that, the tiling was done after the units were fitted, but i now have a Krion base unit gable & Krion breakfast bar on top of the tiles, which I assume would be nigh on impossible to remove.
As an aside I have a friend who's a surveyor, popped in to see me tonight for a look, he's a bit bemused as to what the actual issue is, but he felt some movement & heard noises at random times. He thinks it could be an adhesive issue, but most certainly a poor tiling job, and says like me, he wouldn't be happy to accept it either.
Really dunno what the next step is.
Reply to Kitchen refit gone wrong (poor tiling) in the Australia area at TilersForums.com
Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.