Discuss Bathroom tiling job Derby- before christmas in the Tiling Work | Tiling Jobs - Tilers Required area at TilersForums. USA and UK Tiling Forum

D

Dave Dux

Work needed ASAP. Existing tiler never turned up for the job after bathroom removal. 2 year old and 7 month pregnant wife in house, stress!

floor - insulation board and durabase matting to be installed before tiling. Insulation board can be installed with tile adhesive alone, according to uheat. Patterned tiles to be laid in random pattern. Floor already prepared with 18mm chipboard (noggins installed) and 6mm NMP, installed with nmp megastrength ad and screws.

Walls - tile around bath and wall that includes window and boxing with worktop to conceal cistern. Remaining wall to be tiled to half height. Grout lines to be aligned on all tiles walls.

Option to include dry lining and skimming of one wall. 2m wise by 2m tall.
 

Reply to Bathroom tiling job Derby- before christmas in the Tiling Work | Tiling Jobs - Tilers Required area at TilersForums.com

Or checkout our tile training advice or the Tile Standards

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.

Replies you've not seen

UK Tiling Forum Stats

Threads
66,583
Messages
866,613
Members
9,500
Latest member
Dazzer
Top