Discuss Opinions , 20mm screed removal in the General Off-topic Chat (nothing tile) area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)

D

Dumbo

I've been to look at a screed part of which is 20mm higher than the rest . Easy option screed up , but that's going to take £700 of levelling .
So options I see .
Grind it , score/cut into sections with disc cutter and kango or take that piece of screed right out .
Any bright ideas and options welcome
 
I

Italy

upload_2019-4-20_12-34-14.jpeg
...
 
Q

Qwerty

Ive only ever ground down high spots but at the size I'm imagining yours is I reckon your plan is probably better
 

Albert

TF
Esteemed
Arms
Reaction score
9,515
I've been to look at a screed part of which is 20mm higher than the rest . Easy option screed up , but that's going to take £700 of levelling .
So options I see .
Grind it , score/cut into sections with disc cutter and kango or take that piece of screed right out .
Any bright ideas and options welcome
How big is the area you need to remove? Can you not fix 20mm backer board
 
D

Dumbo

How big is the area you need to remove? Can you not fix 20mm backer board
Removal area about 1.5 x 3.5 . Thick backer board and floating level is an option but its then the knock on effect to the kitchen, maybe I should of mentioned that.
 

Albert

TF
Esteemed
Arms
Reaction score
9,515
You could hire a floor chasing machine set it at the hight you
need and run it back and forth then finish with a kango,
or hammer and chisel
 
O

One Day

Albert's idea would work but is very very labour intensive.
Grinding with dust control would be physically easier.
Whatever you do it's going to be an expensive soul destroying pig of a job.

Personally, I'd offer suggestions to the customer on how it could be done, and offer to come back when it is done!
 
D

Dumbo

Albert's idea would work but is very very labour intensive.
Grinding with dust control would be physically easier.
Whatever you do it's going to be an expensive soul destroying pig of a job.

Personally, I'd offer suggestions to the customer on how it could be done, and offer to come back when it is done!
I was thinking . "You best get the builder back to sort his shoddy work out , I will also leave this yellow stick which has a bubble in it. "
 

Reply to Opinions , 20mm screed removal in the General Off-topic Chat (nothing tile) area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,337
Messages
881,104
Members
9,527
Latest member
voltage2688
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks