Day 2.....sigh...

  • Trip to the local rubbish dump to get rid of yesterdays rubble.
  • Purchase band aids, Tramedol, kneepads and gloves (and a sausage & egg McMuffin) on the way back home.
  • Measure, layout and mark all locations for shower drain, shower taps and plumbing, basin taps and plumbing, glass shower screen etc.
  • Excavate through the screed and into slab to allow 800mm Wirquin shower drain pan to be positioned.
  • Chase 50mm shower drain into floor and open wall to allow it to drain into external gulley.
  • Carefully plane gradual slope towards drain pan into shower floor using jackhammer.
  • Cut back plaster and brickwork around window to prevent finished tile level covering the entire wooden window frame.
  • Chase walls for plumbing pipes.
  • Smooth all walls and floor with a diamond cup-wheel disk to remove high spots.
  • Early finish.
 
OP
M

Marvo

Day 3

  • Cemented all the holes in the floor.
  • By 9.30am I'd had enough and decided to go fishing instead.
Lessons learned;
Fishing is far more pleasurable than building work.

10.jpg

4th from the left, even after several Tremadol I'm still aching so much I'm struggling to hold up the 88 kilo yellowfin tuna.
 
OP
S

Spare Tool

Day 3

  • Cemented all the holes in the floor.
  • By 9.30am I'd had enough and decided to go fishing instead.
Lessons learned;
Fishing is far more pleasurable than building work.

View attachment 102370

4th from the left, even after several Tremadol I'm still aching so much I'm struggling to hold up the 88 kilo yellowfin tuna.
200lb WOW... It looks like the guy on the lefts fish had a little argument with a shark on the way in?
 
OP
M

Marvo

Lol, just over 190lb and it was the third biggest fish of the 14 fish in total. I've given away around 30 kilos this evening and still got more tuna steaks than I can fit in my freezers. The dinner menu in our house is going to be heavily tuna oriented for the next few months :D.
 
OP
M

Marvo

Day 4. A little more productive than day 3....which isn't saying much.

  • Switch off water to house and drain pipework.
  • Get sidetracked by a previously undiscovered back-syphoning issue between the split water supplies feeding the house. (Most of the house is fed by borehole water, the kitchen only is fed by municipal water....or so I thought until I accidentally discovered otherwise this morning.)
  • Dry-fit basin and install 40mm drain pipework.
  • Make lightly seared sesame tuna steaks for lunch.
  • Reroute 22mm main plumbing feed to a more convenient route and tee in for basin and shower.
  • Install 15mm hot and cold pipes to below basin fit angle valves.
  • Install 15mm pipework for shower taps and cap-off for now.
  • Cement pipework chases where possible.
Lessons learned;
  1. I'm a painfully slow plumber.
  2. Anytime you really need some time without interuptions a customer is guaranteed to phone with an emergency that means you have to drop everything.
 
Last edited by a moderator:
OP
M

Marvo

I have a couple of questions if I may.

Firstly I can't decide if I should tile the floor first or the walls...

Second, where is the best place to start tile for both the walls and the floor?

Lastly, and I realise this is probably a plumbing question rather than a tile one, the new basin has knockouts for the taps. Do you just give them a whack with something to break them out or is there a more scientific way to ensure they fracture smoothly?

3.jpg
 
OP
J

J Sid

I nearly always do the floor first....others may not.
setting out....what size tiles are you using and how do you want them, portrait or landscape, straight or staggered?
 
OP
W

WetSaw

Knock out for tap not taps unless you like waving your hands under the hot then cold taps... I tap them out then tidy up with a diamond core drill.

I usually do floor first then I have a ( relatively..) level point to tile the walls from. Where to start depends on quite a lot of things!
 

Reply to Not Sure How You Guys Do This Every Day in the DIY Tiling Forum area at TilersForums.com

Or checkout our tile training advice or the Tile Standards

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.

New Tiling Questions

UK Tiling Forum Stats

Threads
66,600
Messages
866,704
Members
9,511
Latest member
mmcdon47
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock