Old 22-04-2008   #1
New TilersForums Contributor
Points: 280, Level: 5 Points: 280, Level: 5 Points: 280, Level: 5
Activity: 0% Activity: 0% Activity: 0%
 

Join Date: Apr 2008
Posts: 3
Thanks: 0
Thanked 0 Times in 0 Posts
j2112c is on a distinguished road
View j2112c's Photo Album
Default How to price up jobs?

A question on pricing jobs up, what do the pro tilers here take into account when pricing up a job? I am starting out and though not asking rates per metre I would like to know what a rookie should bear in mind, you know, cost of disposing of tiles/waste, particularly time consuming jobs ect.

j2112c is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote

This is an Adsense Revenue Sharing Forum.
Old 22-04-2008   #2
Regular TilersForums Contributor
Points: 2,750, Level: 31 Points: 2,750, Level: 31 Points: 2,750, Level: 31
Activity: 0% Activity: 0% Activity: 0%
 

Join Date: Oct 2007
Location: Inverkeithing Fife
Posts: 355
Thanks: 6
Thanked 24 Times in 16 Posts
TheWrightTiler will become famous soon enough
View TheWrightTiler's Photo Album
Default Re: How to price up jobs?

howdo matey

unless otherwise agreed then rubbish remains the responsibility of homeowner

if they want u to dispose charge accordingly but bear in mind if using commercial vehicle then charges may apply at your local tip

i price up by the metre for most jobs or day rates for splashbacks etc

always add on for adhesives grouts and primers

rule of thumb is 5m to a bag or tub

eg

20 metres floor at 22 quid

440

requires ply laying

so 7 sheets at 30 a sheet supplied and fitted

210

4 tubs adhesive at 16 a tub , i charge my punters the difference between trade and retail for their adhesives and grouts (so a tub of good water resistant adhesive is 25 retail and 9 trade so i charge them 16 lol), explain that you are saving them 9 quid a tub

64

2 bags grout at 9 a bag

18

1 bottle primer from 6 a ltr

6

= 738

i would then round down to the 700 mark inc materials as you are making wee bit extra on the materials so not really losing out etc, but extra for tile trims and door trims if required and stone sealers.

same as rubbish removal and white goods removal for tiling under washing machines etc, charge an hours labour etc for this, theres always the chance to trim the odd door to accomodate new tiles at 15 - 20 a door. then you have the ply and screws to add on if required and a rough price is £30 per 8x4 sheet supplied and fitted which will cover 3m2

hope this helps

andy
TheWrightTiler is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 22-04-2008   #3
sWe
TilersForums Trusted Member

Points: 6,463, Level: 52 Points: 6,463, Level: 52 Points: 6,463, Level: 52
Activity: 57% Activity: 57% Activity: 57%
 
sWe's Avatar
 

Join Date: Feb 2008
Location: Sweden
Posts: 1,548
Thanks: 64
Thanked 173 Times in 118 Posts
sWe has a spectacular aura aboutsWe has a spectacular aura about
View sWe's Photo Album Send a message via MSN to sWe
Default Re: How to price up jobs?

Here follows an extended edition of my guide to pricing

sWe's guide to pricing

Introduction

I don't believe you can have linear pricing if you want to have a steady income. One price per square meter which is just right for, say, bathrooms, is probably completely off when quoting kitchens, or really large terrazos, etc. It is better to base your pricing on day rates, but there are many things to consider.

It comes down to the following:
  • How long is the job going to take? Smaller jobs take proportionally more time than larger jobs.
  • How difficult will it be? Are there variables which might complicate the job? Will you want extra pay for those variables?
  • How much do you want to make in the end? How much do you need to make in the end?
  • Can you remain competative with the derived pricing?
I have little knowledge of what reasonable pricing in the UK is, or how your tax system works, so you may need to modify the following a bit to better suit your conditions.


The basic numbers

Tally the static expenses relating to your business an average year. These include tool purchases/repairs, trade insurance, tax and maintenance on your vechicle, etc.

Divide the sum by the number of months you work an average year.

Add what you need to make in an average month to have a reasonable standard of living, including tax.

If you plan on taking a vacation lasting, say, a month, make sure to add a months salary divided by the number of months you work an average year.

Lets say, for demonstrational purposes, that the sum you come up with is £2000.

Here's a kicker: Not all your work is spent on things you can charge for. Unpaid time includes doing paperwork, meeting customers, etc.
You need to take this into account.

Say you spend 80% of you working time on things which you can charge for.
Divide £2000 by 0,80 (80%). The result is £2500.
Divide £2500 by the number of days you work an average month (22 for a 5 day week in an average month).
The result is that you need to make £113 a day if you work five days a week, of which 80% of the time is on things which pay, to earn £2000 in a month.

You have to put your pricing in relation to this, as well as the going rates on the market. A day-rate of £130 seems to be common when reading on these forums. If this is the case where you live, and the £113/day applies to you, then all is well, and if you manage to consistently get £130 a day, then you'll end up with a £375 profit every month. That's almost 19%.

If the local day-rate is lower than the £113 you need, you need to either cut your expenses, or increase the amount of time you work on things you can charge for.


Comparing pricing

Lets say you got hired to do a 3m2 kitchen splashback. Lets say it takes you one working day to complete it. If you charge 130$ for it, not counting materials, that's a little shy of £44/m2.

For comparison, lets say you got hired to do a bathroom with a total of 25m2 tiling to be done, and you need to fix the substrate. Lets say it takes you four days to complete. If you charge £130x4 for it, not including materials, that gives you £520, and a m2 price of about £21.


Lets compare a linear rate of £20/m2 + materials, as it seems to be a common price in the UK, with the above method of pricing, using the same examples:

Had you charged £20/m2 + materials for a bathroom (£500), it would've been about right from the economical standpoint we calculated earlier in this post.

Had you charged £20/m2 + materials (£60) for the kitchen splashback, you'd be losing money from the economical standpoint we calculated earlier in this post.

See what I meant about linear pricing being a tad off?


Adding variables


You can add any number of variables to your pricing; those mentioned above are just basic principles.

I'm not going to go into all the details, but based on what I estimated using the above method, I've got a basic call out fee per days work, which is a bit lower than what I want to make per day, but still higher than what I need to make.

On top of that, I've divided my work into categories, for example preparation or changing of the substrate, tiling, etc. Then I add a charge per square metre, which is based on what type of material will be used, and what size the tiles are. I used standard 15x15 ceramic tiles as a base line for pricing. Larger tiles require more attention to adheive coverage and flushness, smaller tiles takes more time cutting and grouting.

If the customer wants patterns other than regular grid patterns, I add another fee per square meter, based on how difficult and time consuming the pattern is.

For special solutions, I charge per instance, square metre, or liner metre, depending on what it is.

I also add fees on an item basis. For example, for drilling in regular ceramics, I've got a fee which covers the wear on my drills, as well as the time spent measuring and drilling. For drilling in porcelain, the fee per hole is higher, to compensate for the heaver wear on the drill bits.

My call out fees and square metre fees cover my labour, basic wear and tear on my tools. Item fees cover the specific wear and tear on tools, and additional time spent. You can include material costs into this, but I prefer to keep them separate.

I've got ALOT of variables listed, which I take into account when pricing. Here are some of them.
  • Total size of wall(s)?
  • Total size of floor(s)?
  • Number of internal corners?
  • Number of external corners?
  • Number of floor drains?
  • Holes to be made in soft ceramics?
  • Holes to be made in hard ceramics?
  • Number of pipes?
  • Size of tiles?
  • Quality of tiles?
  • Width of grout lines?
  • Leveling? Gradient?
  • UFH?
  • Waterproofing?
  • Replace, repair, or reinforce substrate(s)? What type(s)?
  • Removing old tiles? What type of substrate(s) are they on?
  • Will I need to call in other trades?
  • Waste disposal?
  • Renting of special tools?
Etc...

You can add any number of variables to your pricing.


Conclusion

If you, like me, hate surprices, and like being on top of things instead of just charging straght ahead without any further consideration, it really helps to be thorough in all aspects of the game called "The tiling business", not just the tiling itself.

Make a list of variables and prices, and copy it up. When you go to quote jobs, just tick in the numbers, and tally up. Takes a little bit of time to prepare, but you won't have to think much when you go to quote, and it won't take long once you get the hang of it.

Most tilers learn to measure jobs just by eyeing them up. I prefer to be precise.

Just my (many) five cents on the matter.


Last edited by sWe; 22-04-2008 at 03:21 PM.
sWe is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Old 22-04-2008   #4
New TilersForums Contributor
Points: 280, Level: 5 Points: 280, Level: 5 Points: 280, Level: 5
Activity: 0% Activity: 0% Activity: 0%
 

Join Date: Apr 2008
Posts: 3
Thanks: 0
Thanked 0 Times in 0 Posts
j2112c is on a distinguished road
View j2112c's Photo Album
Default Re: How to price up jobs?

Thanks for your help Andy that is the sort of thing I wanted to know, thanks for being open on how to break it down. I suppose as you go along you can very quickly price up a job through experience, but starting out I did not want to be too far off the mark, especially as though the quality is there I am still quite slow. If I don't take everything into account it is a poor return for the time.
Ta, John.

j2112c is offline  
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply

Bookmarks

Tags
jobs, price
Discuss How to price up jobs? at the Tiling Forum within the TilersForums.co.uk | Tile Forums | Tiling Forum; A question on pricing jobs up, what do the pro tilers here take into account ...
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
What jobs have u got booked in ? - Encouragement for new tilers Leatherface Tiling Forum 14 24-04-2007 05:07 PM

Google Search

All times are GMT. The time now is 08:52 AM.


Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.2.0 RC8



Looking for a tiler?
Post Your Tiling Job HERE for FREE!
----------

COMMUNITY SPONSORS

Suppliers
Tiling Tools by Trade Tiler  Forum Sponsors of Tiling Tools

CTD Tiles & TILE Base; Tilers Forum Sponsors

Quality Wetroom Solutions

Electric Underfloor Heating by UHeat

General Sponsors

TSJ - Tile and Stone Journal - THE Tile & Stone Journal

Tile UK Magazine

Traders Liability Insurance - Liability Insurance for Tilers

Find Trusted Tradesmen

Sponsor Tilers Forums - The UK's Biggest Tile Forum / Tile Forums

Tiling Courses
Tiling Courses by NETT

Plastering Courses

Tiling Courses by Chase Tiling Academy

Plumbing Courses by Chase Plumbing Academy

Tiling Courses by Diamond Training Centre

Plastering Courses by Diamond Training Centre

Tiling Courses by Able Skills

Tiling Courses by Tiler Training School

Construction Courses by ConstructionSkills College Limited

Move to Australia!

Yorkshire Tiling Academy

Manufacturers
Drill Porcelain Tile - 365Drills

Mapei Tile Adhesive

Perfect Silicone Joints - Supporting the Tile Forum

Rubi Tiling Tools : Sponsors of the Tiling Forum

Schluter Systems

Our sponsors keep the forum free to use, please click their banners (above) and use the sponsors when you can. Some offer special rates to forum members too.

OTHER LINKS

Top Forums
Tile Forums
US/CA Tile Forums
Spanish Tiles
OZ Tile Forums
Tiling Tools
Tiling Courses
Tile Adhesives

Find a Tiler, London Tiler, Manchester Tiler, Liverpool Tiler, Birmingham Tiler with Find Trusted Tradesmen .


[Output: 85.52 Kb. compressed to 81.41 Kb. by saving 4.10 Kb. (4.80%)]

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103