Quoted for a bathroom last night, the guy nearly choked on his tea when I gave him the price. When I get calls from the paper I rarely get the job, when it's recommendations, I always get them.
Anyway, the job last night was a three piece bathroom plus a shower cubicle. Only the bath and the shower base would be installed. The plasterer was there skimming the walls so nice smooth walls.
The customer wanted tiling approx 1.1m up the wall and all around the shower cubicle. A few holes needed drilling for shower, radiator and toilet pipes etc, and cuts around the bath. No window as the tiling would come just under it. Total metreage was 11. Customer wanted metal trim.
The floor was approx 5m2, again only cutting aroung the bath and shower base. Also the toilet waste pipe.
All tiling would be straight set, size of tiles not decided but not "big" tiles.
I thought I could do the wall tiling in two days, grouting included, and do the floor in one day, maybe run over by half a day.
Priced the whole job at £450 including adhesive and grout, working on £120 per day.
Does this sound excessive? Should I be tiling faster and therefore quoting cheaper?
Any comments appreciated.